Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
19
matching recommendationsSIC | 364 | Electric Lighting And Wiring Equipment |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TN0218 # 07 Y:1984 | 07 | 1984 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $677 | $90 | Implemented |
TN0218 # 06 Y:1984 | 06 | 1984 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $758 | $0 | Not Implemented |
TN0218 # 05 Y:1984 | 05 | 1984 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $5,078 | $4,350 | Not Implemented |
TN0218 # 04 Y:1984 | 04 | 1984 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,746 | $180 | Not Implemented |
TN0218 # 03 Y:1984 | 03 | 1984 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $4,352 | $3,700 | Implemented |
TN0218 # 02 Y:1984 | 02 | 1984 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,382 | $0 | Not Implemented |
TN0218 # 01 Y:1984 | 01 | 1984 | USE WASTE HEAT FROM HOT FLUE GASES TO GENERATE STEAM | $8,908 | $15,000 | Not Implemented |
KU0121 # 10 Y:1984 | 10 | 1984 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $447 | $215 | Not Implemented |
KU0121 # 12 Y:1984 | 12 | 1984 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $118 | $0 | Not Implemented |
KU0121 # 11 Y:1984 | 11 | 1984 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $298 | $100 | Implemented |
KU0121 # 01 Y:1984 | 01 | 1984 | INSTALL TIMERS AND/OR THERMOSTATS | $8,835 | $0 | Implemented |
KU0121 # 09 Y:1984 | 09 | 1984 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $835 | $1,200 | Implemented |
KU0121 # 08 Y:1984 | 08 | 1984 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,132 | $0 | Not Implemented |
KU0121 # 07 Y:1984 | 07 | 1984 | USE MINIMUM SAFE OVEN VENTILATION | $474 | $0 | Implemented |
KU0121 # 06 Y:1984 | 06 | 1984 | REPLACE BROKEN WINDOWS AND/OR WINDOW SASH | $2,034 | $738 | Implemented |
KU0121 # 05 Y:1984 | 05 | 1984 | COVER OPEN TANKS | $2,396 | $4,000 | Not Implemented |
KU0121 # 04 Y:1984 | 04 | 1984 | INSULATE BARE EQUIPMENT | $3,959 | $1,000 | Implemented |
KU0121 # 03 Y:1984 | 03 | 1984 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,383 | $2,250 | Implemented |
KU0121 # 02 Y:1984 | 02 | 1984 | INSTALL TIMERS AND/OR THERMOSTATS | $376 | $200 | Not Implemented |