Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

51

matching recommendations
Reset
SIC 367 Electronic Components And Accessories
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0626 # 05 Y:2009 05 2009 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,140 $360 Not Implemented
CO0626 # 04 Y:2009 04 2009 USE PHOTOCELL CONTROLS $2,350 $620 Not Implemented
CO0626 # 03 Y:2009 03 2009 USE SOLAR HEAT TO MAKE ELECTRICTY $5,100 $45,500 Not Implemented
CO0626 # 02 Y:2009 02 2009 USE DEMAND CONTROLLER OR LOAD SHEDDER $7,900 $0 Not Implemented
CO0626 # 06 Y:2009 06 2009 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $370 $780 Not Implemented
CO0626 # 01 Y:2009 01 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $46,520 $7,500 Implemented
CO0591 # 07 Y:2006 07 2006 DISCONNECT BALLASTS $310 $110 Implemented
CO0591 # 06 Y:2006 06 2006 INSTALL OCCUPANCY SENSORS $1,350 $1,290 Not Implemented
CO0591 # 01 Y:2006 01 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,430 $200 Implemented
CO0591 # 02 Y:2006 02 2006 TURN OFF EQUIPMENT WHEN NOT IN USE $610 $0 Implemented
CO0591 # 03 Y:2006 03 2006 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $260 $30 Not Implemented
CO0591 # 04 Y:2006 04 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,680 $5,290 Not Implemented
CO0591 # 05 Y:2006 05 2006 USE SOLAR HEAT TO MAKE ELECTRICTY $3,900 $32,600 Not Implemented
CO0573 # 02 Y:2005 02 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,040 $1,030 Implemented
CO0573 # 06 Y:2005 06 2005 USE SOLAR HEAT TO HEAT WATER $28,910 $121,820 Not Implemented
CO0573 # 01 Y:2005 01 2005 USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST $99,230 $295,000 Not Implemented
CO0573 # 13 Y:2005 13 2005 RECOVER WASTE HEAT FROM EQUIPMENT $530 $1,600 Not Implemented
CO0573 # 14 Y:2005 14 2005 USE SOLAR HEAT TO HEAT MAKE-UP AIR $340 $3,400 Not Implemented
CO0573 # 03 Y:2005 03 2005 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $961 $752 Implemented
CO0573 # 04 Y:2005 04 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $520 $2,950 Not Implemented
CO0573 # 05 Y:2005 05 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $500 $780 Implemented
CO0573 # 10 Y:2005 10 2005 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,530 $0 Implemented
CO0573 # 12 Y:2005 12 2005 USE SOLAR HEAT FOR HEAT $730 $1,400 Not Implemented
CO0573 # 07 Y:2005 07 2005 INSTALL OCCUPANCY SENSORS $8,750 $4,790 Implemented
CO0573 # 09 Y:2005 09 2005 USE OPTIMUM THICKNESS INSULATION $3,590 $5,150 Not Implemented