Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
34
matching recommendationsSIC | 367 | Electronic Components And Accessories |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SF0560 # 05 Y:2020 | 05 | 2020 | USE SOLAR HEAT TO MAKE ELECTRICTY | $15,645 | $78,611 | Implemented |
SF0560 # 04 Y:2020 | 04 | 2020 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $13,118 | $45,851 | Implemented |
SF0560 # 03 Y:2020 | 03 | 2020 | INSTALL OCCUPANCY SENSORS | $4,726 | $14,983 | Implemented |
SF0560 # 02 Y:2020 | 02 | 2020 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $16,680 | $26,850 | Not Implemented |
SF0560 # 01 Y:2020 | 01 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,246 | $70 | Not Implemented |
CL2007 # 02 Y:2020 | 02 | 2020 | INSULATE BARE EQUIPMENT | $936 | $5,431 | Implemented |
CL2007 # 04 Y:2020 | 04 | 2020 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $637 | $630 | Not Implemented |
CL2007 # 03 Y:2020 | 03 | 2020 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $58,440 | $10,000 | Not Implemented |
CL2007 # 01 Y:2020 | 01 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,082 | $10,098 | Implemented |
WV0592 # 09 Y:2020 | 09 | 2020 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $829 | $3,850 | Not Implemented |
WV0592 # 06 Y:2020 | 06 | 2020 | INSTALL SET-BACK TIMERS | $1,823 | $222 | Implemented |
WV0592 # 05 Y:2020 | 05 | 2020 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $1,832 | $4,720 | Not Implemented |
WV0592 # 04 Y:2020 | 04 | 2020 | MINIMIZE WATER USAGE | $3,145 | $2,100 | Implemented |
WV0592 # 03 Y:2020 | 03 | 2020 | INSTALL OCCUPANCY SENSORS | $4,217 | $9,054 | Implemented |
WV0592 # 02 Y:2020 | 02 | 2020 | RECYCLE WHITE WATER | $6,078 | $6,252 | Not Implemented |
WV0592 # 01 Y:2020 | 01 | 2020 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $8,201 | $9,500 | Implemented |
WV0592 # 07 Y:2020 | 07 | 2020 | UPGRADE CONTROLS ON COMPRESSORS | $1,361 | $3,757 | Not Implemented |
WV0592 # 08 Y:2020 | 08 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $964 | $3,240 | Implemented |
WV0592 # 12 Y:2020 | 12 | 2020 | DEVELOP A REPAIR/REPLACE POLICY | $372 | $303 | Implemented |
WV0592 # 14 Y:2020 | 14 | 2020 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $47 | $250 | Not Implemented |
WV0592 # 10 Y:2020 | 10 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $723 | $1,312 | Implemented |
WV0592 # 11 Y:2020 | 11 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $397 | $36 | Implemented |
WV0592 # 13 Y:2020 | 13 | 2020 | INSULATE BARE EQUIPMENT | $157 | $742 | Implemented |
GT0939 # 01 Y:2020 | 01 | 2020 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $10,466 | $500 | Not Implemented |
GT0939 # 02 Y:2020 | 02 | 2020 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $17,391 | $2,000 | Implemented |