IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

25

matching recommendations
Reset
SIC 3679 Electronic Components, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0413 # 09 Y:2022 09 2022 INSTALL OCCUPANCY SENSORS $355 $140 Implemented
MI0413 # 08 Y:2022 08 2022 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $755 $645 Implemented
MI0413 # 07 Y:2022 07 2022 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $897 $2,750 Not Implemented
MI0413 # 06 Y:2022 06 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,004 $1,980 Implemented
MI0413 # 05 Y:2022 05 2022 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $1,089 $5,264 Implemented
MI0413 # 04 Y:2022 04 2022 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,034 $580 Implemented
MI0413 # 03 Y:2022 03 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,013 $5,249 Implemented
MI0413 # 02 Y:2022 02 2022 TURN OFF EQUIPMENT WHEN NOT IN USE $4,023 $0 Implemented
MI0413 # 01 Y:2022 01 2022 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $7,040 $10,116 Not Implemented
OK1071 # 04 Y:2022 04 2022 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,640 $0 Not Implemented
OK1071 # 03 Y:2022 03 2022 INSTALL SPECTRAL REFLECTORS / DELAMP $9,419 $0 Not Implemented
OK1071 # 02 Y:2022 02 2022 REPLACE TREATED WATER WITH WELL / SURFACE WATER $12,657 $10,000 Not Implemented
OK1071 # 01 Y:2022 01 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $25,382 $61,013 Implemented
DL0203 # 12 Y:2022 12 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,363 $3,109 Implemented
DL0203 # 11 Y:2022 11 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,145 $39 Not Implemented
DL0203 # 10 Y:2022 10 2022 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $1,239 $3,000 Not Implemented
DL0203 # 09 Y:2022 09 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $508 $1,000 Implemented
DL0203 # 08 Y:2022 08 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $88 $117 Implemented
DL0203 # 07 Y:2022 07 2022 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $567 $0 Implemented
DL0203 # 06 Y:2022 06 2022 INSTALL TIMERS AND/OR THERMOSTATS $1,119 $145 Not Implemented
DL0203 # 05 Y:2022 05 2022 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $6,224 $0 Implemented
DL0203 # 04 Y:2022 04 2022 TURN OFF EQUIPMENT WHEN NOT IN USE $179 $0 Not Implemented
DL0203 # 03 Y:2022 03 2022 UPGRADE CONTROLS ON COMPRESSORS $4,027 $31,018 Not Implemented
DL0203 # 02 Y:2022 02 2022 USE OPTIMUM TEMPERATURE $309 $0 Not Implemented
DL0203 # 01 Y:2022 01 2022 TURN OFF EQUIPMENT WHEN NOT IN USE $1,561 $0 Not Implemented