Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

258

matching recommendations
Reset
SIC 3699 Electrical Equipment & Supplies, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UK1213 # 10 Y:2012 10 2012 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $49,180 $6,650 Not Implemented
UK1213 # 09 Y:2012 09 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $316 $327 Not Implemented
UK1213 # 08 Y:2012 08 2012 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $654 $337 Implemented
UK1213 # 07 Y:2012 07 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $343 $269 Implemented
UK1213 # 06 Y:2012 06 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $350 $500 Not Implemented
UK1213 # 05 Y:2012 05 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $460 $756 Not Implemented
UK1213 # 04 Y:2012 04 2012 UPGRADE CONTROLS ON COMPRESSORS $4,375 $10,500 Not Implemented
UK1213 # 03 Y:2012 03 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,410 $26,824 Implemented
UK1213 # 02 Y:2012 02 2012 OPTIMIZE PLANT POWER FACTOR $14,754 $11,220 Not Implemented
UK1213 # 01 Y:2012 01 2012 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $16,324 $0 Implemented
MZ0091 # 01 Y:2012 01 2012 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $190,000 $5,000 Implemented
MZ0091 # 02 Y:2012 02 2012 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $18,699 $0 Implemented
MZ0091 # 03 Y:2012 03 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $30,809 $27,800 Implemented
MZ0091 # 04 Y:2012 04 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,504 $0 Implemented
MZ0091 # 05 Y:2012 05 2012 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $3,133 $0 Implemented
MZ0091 # 06 Y:2012 06 2012 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $24,311 $9,516 Implemented
SU0159 # 06 Y:2003 06 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,028 $0 Implemented
SU0159 # 07 Y:2003 07 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $276 $523 Implemented
SU0159 # 04 Y:2003 04 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,171 $0 Implemented
SU0159 # 03 Y:2003 03 2003 USE SYNTHETIC LUBRICANT $1,187 $800 Implemented
SU0159 # 05 Y:2003 05 2003 REPLACE BOILER $1,148 $13,507 Implemented
SU0159 # 02 Y:2003 02 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,575 $15,750 Not Implemented
SU0159 # 01 Y:2003 01 2003 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $5,869 $18,122 Not Implemented
UF0311 # 03 Y:2002 03 2002 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,246 $0 Not Implemented
UF0311 # 02 Y:2002 02 2002 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $20,300 $1,640 Implemented