IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

9,504

matching recommendations
Reset
SIC 37 Transportation Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0339 # 04 Y:1991 04 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $496 $441 Implemented
AS0022 # 01 Y:1991 01 1991 INSTALL TIMERS AND/OR THERMOSTATS $27,958 $5,100 Implemented
AS0022 # 02 Y:1991 02 1991 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM $12,409 $30,000 Implemented
AS0022 # 03 Y:1991 03 1991 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,189 $2,775 Implemented
AS0022 # 04 Y:1991 04 1991 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,153 $1,500 Implemented
AS0022 # 05 Y:1991 05 1991 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,472 $1,100 Implemented
AS0022 # 06 Y:1991 06 1991 INSTALL SET-BACK TIMERS $2,580 $2,325 Implemented
AS0022 # 07 Y:1991 07 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,326 $50,000 Implemented
AS0022 # 08 Y:1991 08 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $691 $550 Implemented
AS0022 # 09 Y:1991 09 1991 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $448 $515 Implemented
AS0022 # 10 Y:1991 10 1991 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $521 $0 Implemented
AS0022 # 11 Y:1991 11 1991 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $37,471 $100,000 Implemented
OK0335 # 01 Y:1991 01 1991 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,200 $0 Implemented
OK0335 # 02 Y:1991 02 1991 INSTALL TIMERS AND/OR THERMOSTATS $1,787 $1,500 Implemented
OK0335 # 03 Y:1991 03 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $197 $78 Implemented
OK0335 # 04 Y:1991 04 1991 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $162 $395 Implemented
UD0336 # 01 Y:1991 01 1991 USE DEMAND CONTROLLER OR LOAD SHEDDER $9,806 $10,000 Implemented
UD0336 # 02 Y:1991 02 1991 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $4,950 $5,000 Implemented
UD0336 # 03 Y:1991 03 1991 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $8,317 $300 Implemented
UD0336 # 04 Y:1991 04 1991 INSTALL SET-BACK TIMERS $5,078 $0 Implemented
TN0421 # 01 Y:1991 01 1991 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $30,358 $17,288 Implemented
TN0421 # 02 Y:1991 02 1991 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,865 $390 Implemented
TN0421 # 03 Y:1991 03 1991 CLOSE OFF UNNEEDED STEAM LINES $1,536 $0 Implemented
TN0421 # 04 Y:1991 04 1991 COVER OPEN TANKS $944 $500 Implemented
TN0421 # 05 Y:1991 05 1991 USE MINIMUM STEAM OPERATING PRESSURE $417 $0 Implemented