IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

238

matching recommendations
Reset
SIC 37 Transportation Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0437 # 02 Y:1994 02 1994 RECOVER WASTE HEAT FROM EQUIPMENT $1,097 $1,500 Not Implemented
UD0437 # 01 Y:1994 01 1994 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,799 $0 Not Implemented
WV0040 # 03 Y:1994 03 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $762 $21,980 Implemented
AS0123 # 01 Y:1994 01 1994 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $3,476 $3,000 Implemented
AS0123 # 02 Y:1994 02 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,783 $2,800 Implemented
AS0123 # 03 Y:1994 03 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,051 $2,241 Implemented
AS0123 # 04 Y:1994 04 1994 TURN OFF EQUIPMENT WHEN NOT IN USE $1,552 $360 Not Implemented
AS0123 # 05 Y:1994 05 1994 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $878 $1,575 Implemented
AS0123 # 06 Y:1994 06 1994 USE PHOTOCELL CONTROLS $1,809 $390 Implemented
AS0123 # 07 Y:1994 07 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,651 $7,224 Not Implemented
AS0123 # 08 Y:1994 08 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,144 $1,902 Implemented
WV0040 # 01 Y:1994 01 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $977 $4,304 Implemented
WV0040 # 02 Y:1994 02 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $73 $482 Implemented
WV0040 # 04 Y:1994 04 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $28,727 $750 Implemented
WV0040 # 11 Y:1994 11 1994 RECOVER WASTE HEAT FROM EQUIPMENT $213 $250 Not Implemented
WV0040 # 10 Y:1994 10 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $724 $0 Implemented
WV0040 # 09 Y:1994 09 1994 INSTALL TIMERS AND/OR THERMOSTATS $4,403 $275 Not Implemented
WV0040 # 08 Y:1994 08 1994 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $7,634 $1,000 Not Implemented
WV0040 # 07 Y:1994 07 1994 OPTIMIZE PLANT POWER FACTOR $5,004 $13,195 Not Implemented
WV0040 # 06 Y:1994 06 1994 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $5,572 $3,600 Not Implemented
WV0040 # 05 Y:1994 05 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $189 $220 Not Implemented
UF0097 # 04 Y:1994 04 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,231 $17,559 Implemented
UF0097 # 07 Y:1994 07 1994 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,828 $10,000 Not Implemented
UF0097 # 05 Y:1994 05 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $873 $3,458 Not Implemented
UF0097 # 06 Y:1994 06 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,478 $1,000 Implemented