Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,374
matching recommendationsSIC | 371 | Motor Vehicles And Equipment |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0550 # 07 Y:2017 | 07 | 2017 | USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS | $6,922 | $31,792 | Not Implemented |
WV0550 # 08 Y:2017 | 08 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,057 | $30,000 | Not Implemented |
WV0550 # 09 Y:2017 | 09 | 2017 | INSTALL OCCUPANCY SENSORS | $4,238 | $3,925 | Implemented |
WV0550 # 10 Y:2017 | 10 | 2017 | OPTIMIZE PLANT POWER FACTOR | $4,200 | $14,250 | Not Implemented |
WV0550 # 11 Y:2017 | 11 | 2017 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,230 | $1,100 | Implemented |
WV0550 # 12 Y:2017 | 12 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,173 | $64 | Implemented |
WV0550 # 13 Y:2017 | 13 | 2017 | DEVELOP A REPAIR/REPLACE POLICY | $2,757 | $647 | Implemented |
WV0550 # 14 Y:2017 | 14 | 2017 | USE POWER DURING OFF-PEAK PERIODS | $2,151 | $443 | Not Implemented |
WV0550 # 15 Y:2017 | 15 | 2017 | INSULATE BARE EQUIPMENT | $610 | $1,042 | Implemented |
WV0550 # 16 Y:2017 | 16 | 2017 | INSULATE BARE EQUIPMENT | $496 | $1,754 | Implemented |
TT0196 # 01 Y:2017 | 01 | 2017 | USE SOLAR HEAT FOR HEAT | $36,417 | $148,815 | Not Implemented |
TT0196 # 02 Y:2017 | 02 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $19,605 | $3,050 | Implemented |
TT0196 # 03 Y:2017 | 03 | 2017 | OPTIMIZE PLANT POWER FACTOR | $5,438 | $19,250 | Not Implemented |
TT0196 # 04 Y:2017 | 04 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,985 | $31 | Not Implemented |
TT0196 # 05 Y:2017 | 05 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,539 | $1,150 | Not Implemented |
BS0100 # 01 Y:2017 | 01 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,619 | $437 | Not Implemented |
BS0100 # 02 Y:2017 | 02 | 2017 | ELIMINATE/REDUCE AN OPERATION | $247 | $89 | Not Implemented |
BS0100 # 03 Y:2017 | 03 | 2017 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $703 | $90 | Not Implemented |
BS0100 # 04 Y:2017 | 04 | 2017 | INSTALL OCCUPANCY SENSORS | $284 | $39 | Not Implemented |
BS0100 # 05 Y:2017 | 05 | 2017 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $640 | $8 | Not Implemented |
BS0100 # 06 Y:2017 | 06 | 2017 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $80 | $100 | Not Implemented |
BS0100 # 07 Y:2017 | 07 | 2017 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $4,572 | $14,699 | Not Implemented |
BS0100 # 08 Y:2017 | 08 | 2017 | RECOVER WASTE HEAT FROM EQUIPMENT | $488 | $564 | Not Implemented |
BS0100 # 09 Y:2017 | 09 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,791 | $16,366 | Not Implemented |
IC0195 # 01 Y:2017 | 01 | 2017 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $7,465 | $3,408 | Not Implemented |