IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

489

matching recommendations
Reset
SIC 3711 Motor Vehicles And Car Bodies
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0148 # 10 Y:1998 10 1998 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $5,903 $70 Not Implemented
SF0148 # 11 Y:1998 11 1998 CONVERT TO AIR ASSISTED / AIRLESS PAINT GUNS $73,076 $5,598 Not Implemented
HO0170 # 01 Y:1998 01 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,110 $35,934 Implemented
HO0170 # 02 Y:1998 02 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $652 $500 Implemented
HO0170 # 03 Y:1998 03 1998 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $920 $20 Implemented
HO0170 # 04 Y:1998 04 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $455 $60 Implemented
HO0170 # 05 Y:1998 05 1998 RECOVER WASTE HEAT FROM EQUIPMENT $1,250 $200 Not Implemented
HO0170 # 06 Y:1998 06 1998 USE RADIANT HEATER FOR SPOT HEATING $3,205 $9,600 Implemented
HO0170 # 07 Y:1998 07 1998 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $774 $750 Implemented
HO0170 # 08 Y:1998 08 1998 INSTALL AUTOMATIC PACKING EQUIPMENT $4,800 $5,200 Implemented
HO0170 # 09 Y:1998 09 1998 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $611 $500 Implemented
HO0170 # 10 Y:1998 10 1998 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $15,000 $1,040 Not Implemented
HO0170 # 11 Y:1998 11 1998 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $24,440 $500 Not Implemented
HO0170 # 12 Y:1998 12 1998 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $3,055 $2,500 Not Implemented
UM0109 # 01 Y:1998 01 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $168 $208 Implemented
UM0109 # 02 Y:1998 02 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $924 $2,743 Not Implemented
UM0109 # 03 Y:1998 03 1998 INSTALL OCCUPANCY SENSORS $851 $400 Not Implemented
UM0109 # 04 Y:1998 04 1998 INSTALL SKYLIGHTS $504 $2,100 Not Implemented
UM0109 # 05 Y:1998 05 1998 RECOVER AND REUSE COOLING WATER $555 $1,200 Not Implemented
UM0109 # 06 Y:1998 06 1998 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $44,450 $100 Implemented
OR0305 # 01 Y:1997 01 1997 REDUCE SCRAP PRODUCTION $89,400 $15,300 Not Implemented
OR0305 # 02 Y:1997 02 1997 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $24,200 $139,000 Not Implemented
OR0305 # 03 Y:1997 03 1997 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $4,130 $1,200 Implemented
OR0305 # 04 Y:1997 04 1997 CONVERT TO ELECTROSTATIC POWDER COATING $8,400 $4,900 Implemented
OR0305 # 05 Y:1997 05 1997 CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE $1,990 $0 Implemented