Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
14
matching recommendationsSIC | 3724 | Aircraft Engines And Engine Parts |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0382 # 01 Y:2020 | 01 | 2020 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $9,223 | $3,645 | Not Implemented |
MI0382 # 02 Y:2020 | 02 | 2020 | USE SOLAR HEAT TO HEAT WATER | $7,209 | $8,409 | Not Implemented |
MI0382 # 03 Y:2020 | 03 | 2020 | INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS | $5,430 | $2,740 | Not Implemented |
MI0382 # 04 Y:2020 | 04 | 2020 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $4,045 | $1,796 | Not Implemented |
MI0382 # 05 Y:2020 | 05 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,278 | $3,204 | Implemented |
MI0382 # 06 Y:2020 | 06 | 2020 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $2,088 | $1,306 | Not Implemented |
MI0382 # 07 Y:2020 | 07 | 2020 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $964 | $1,884 | Implemented |
MI0381 # 01 Y:2020 | 01 | 2020 | UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM | $23,304 | $57,960 | Not Implemented |
MI0381 # 02 Y:2020 | 02 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $11,914 | $860 | Implemented |
MI0381 # 03 Y:2020 | 03 | 2020 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $7,145 | $2,400 | Not Implemented |
MI0381 # 04 Y:2020 | 04 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,241 | $555 | Implemented |
MI0381 # 05 Y:2020 | 05 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,735 | $980 | Implemented |
MI0381 # 06 Y:2020 | 06 | 2020 | KEEP BOILER TUBES CLEAN | $2,320 | $3,500 | Not Implemented |
MI0381 # 07 Y:2020 | 07 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,688 | $4,905 | Implemented |