IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

245

matching recommendations
Reset
SIC 3731 Ship Building And Repairing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0196 # 05 Y:1994 05 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $560 $1,302 Not Implemented
OR0196 # 06 Y:1994 06 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $869 $2,738 Implemented
OR0196 # 07 Y:1994 07 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $703 $3,150 Not Implemented
OR0196 # 08 Y:1994 08 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $456 $50 Implemented
OR0196 # 09 Y:1994 09 1994 USE POWER DURING OFF-PEAK PERIODS $1,817 $0 Not Implemented
OR0196 # 10 Y:1994 10 1994 OPTIMIZE PLANT POWER FACTOR $527 $1,350 Implemented
UF0063 # 01 Y:1993 01 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,359 $5,917 Not Implemented
UF0063 # 02 Y:1993 02 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,652 $5,262 Not Implemented
UF0063 # 03 Y:1993 03 1993 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $11,110 $13,200 Not Implemented
UF0063 # 04 Y:1993 04 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $180 $306 Not Implemented
UF0063 # 05 Y:1993 05 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $260 $480 Not Implemented
UF0063 # 06 Y:1993 06 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,939 $25,197 Not Implemented
UF0063 # 07 Y:1993 07 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,616 $2,550 Not Implemented
UF0063 # 08 Y:1993 08 1993 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $13,151 $2,000 Not Implemented
UF0063 # 09 Y:1993 09 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,546 $2,000 Not Implemented
UF0063 # 10 Y:1993 10 1993 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $3,712 $1,000 Not Implemented
UF0063 # 11 Y:1993 11 1993 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $3,659 $2,850 Not Implemented
UF0063 # 12 Y:1993 12 1993 INSTALL TIMERS AND/OR THERMOSTATS $1,081 $1,300 Not Implemented
UF0063 # 13 Y:1993 13 1993 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,265 $0 Not Implemented
UF0063 # 14 Y:1993 14 1993 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $1,560 $1,400 Not Implemented
UF0063 # 15 Y:1993 15 1993 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $61,821 $250,000 Not Implemented
AM0161 # 01 Y:1992 01 1992 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,600 $630 Implemented
AM0161 # 02 Y:1992 02 1992 REDUCE LOAD ON ELECTRICAL CONDUCTOR TO REDUCE HEATING LOSSES $4,700 $2,255 Not Implemented
AM0161 # 03 Y:1992 03 1992 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,855 $0 Implemented
AM0161 # 04 Y:1992 04 1992 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,290 $985 Implemented