IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

127

matching recommendations
Reset
SIC 3792 Travel Trailers And Campers
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0087 # 03 Y:1994 03 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,723 $7,946 Implemented
UF0087 # 04 Y:1994 04 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $170 $300 Implemented
UF0087 # 05 Y:1994 05 1994 RECOVER WASTE HEAT FROM EQUIPMENT $5,382 $2,000 Not Implemented
UF0087 # 06 Y:1994 06 1994 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $11,641 $1,500 Not Implemented
UF0087 # 07 Y:1994 07 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,625 $800 Implemented
UF0087 # 08 Y:1994 08 1994 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $39,992 $225,000 Implemented
KU0405 # 01 Y:1993 01 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,867 $475 Implemented
KU0405 # 02 Y:1993 02 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $242 $200 Not Implemented
KU0405 # 03 Y:1993 03 1993 RECOVER WASTE HEAT FROM EQUIPMENT $156 $651 Not Implemented
KU0405 # 04 Y:1993 04 1993 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $2,618 $0 Not Implemented
KU0405 # 05 Y:1993 05 1993 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $354 $520 Not Implemented
KU0405 # 06 Y:1993 06 1993 INSTALL OCCUPANCY SENSORS $571 $1,800 Not Implemented
KU0405 # 07 Y:1993 07 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $93 $340 Not Implemented
KU0405 # 08 Y:1993 08 1993 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $241 $0 Implemented
IA0059 # 01 Y:1993 01 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,092 $300 Implemented
IA0059 # 02 Y:1993 02 1993 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,455 $0 Implemented
IA0059 # 03 Y:1993 03 1993 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $8,568 $27,000 Implemented
IA0059 # 04 Y:1993 04 1993 USE DEMAND CONTROLLER OR LOAD SHEDDER $8,390 $5,850 Implemented
IA0059 # 05 Y:1993 05 1993 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $264 $0 Implemented
IA0059 # 06 Y:1993 06 1993 UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING $8,376 $1,543 Not Implemented
IA0059 # 07 Y:1993 07 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,828 $1,740 Implemented
IA0059 # 08 Y:1993 08 1993 INSTALL OCCUPANCY SENSORS $1,072 $1,530 Implemented
IA0059 # 09 Y:1993 09 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $978 $120 Implemented
KU0346 # 01 Y:1991 01 1991 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,719 $500 Implemented
KU0346 # 02 Y:1991 02 1991 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,121 $200 Implemented