IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,140

matching recommendations
Reset
SIC 38 Instruments And Related Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0136 # 11 Y:2002 11 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $928 $63 Implemented
SU0136 # 12 Y:2002 12 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $928 $0 Implemented
SU0136 # 13 Y:2002 13 2002 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $379 $5 Implemented
SU0136 # 14 Y:2002 14 2002 TURN OFF EQUIPMENT WHEN NOT IN USE $219 $0 Implemented
SU0136 # 15 Y:2002 15 2002 INSTALL FOSSIL FUEL MAKE-UP AIR UNIT $196 $60 Not Implemented
SU0136 # 16 Y:2002 16 2002 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $140 $0 Implemented
UD0644 # 01 Y:2002 01 2002 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $462,150 $500 Not Implemented
UD0644 # 02 Y:2002 02 2002 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $18,360 $0 Implemented
UD0644 # 03 Y:2002 03 2002 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $12,612 $0 Not Implemented
UD0644 # 04 Y:2002 04 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,397 $13,222 Not Implemented
UD0644 # 05 Y:2002 05 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,764 $2,775 Not Implemented
UD0644 # 06 Y:2002 06 2002 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $2,953 $131 Implemented
UD0644 # 07 Y:2002 07 2002 AIR CONDITION ONLY SPACE NECESSARY $1,285 $0 Implemented
UD0644 # 08 Y:2002 08 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $478 $500 Not Implemented
UD0644 # 09 Y:2002 09 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $475 $1,348 Implemented
SF0231 # 01 Y:2002 01 2002 INSTALL SPECTRAL REFLECTORS / DELAMP $8,403 $913 n/a
SF0231 # 02 Y:2002 02 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,732 $4,138 n/a
SF0231 # 03 Y:2002 03 2002 UPGRADE CONTROLS ON COMPRESSORS $20,883 $15,071 n/a
SF0231 # 04 Y:2002 04 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $48,328 $42,988 n/a
SF0231 # 05 Y:2002 05 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $22,557 $20,529 n/a
SF0231 # 06 Y:2002 06 2002 MINIMIZE NON-ESSENTIAL MATERIAL IN HEAT TREATMENT PROCESS $2,391 $2,193 n/a
SF0231 # 07 Y:2002 07 2002 SUBSTITUTE HOT PROCESS FLUIDS FOR STEAM $5,916 $5,753 n/a
SF0231 # 08 Y:2002 08 2002 USE PHOTOCELL CONTROLS $7,529 $8,040 n/a
SF0231 # 09 Y:2002 09 2002 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $6,658 $8,500 n/a
SF0231 # 10 Y:2002 10 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,934 $27,835 n/a