Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
84
matching recommendationsSIC | 382 | Measuring And Controlling Devices |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SU0560 # 01 Y:2024 | 01 | 2024 | DISCONNECT BALLASTS | $1,546 | $0 | n/a |
SU0560 # 02 Y:2024 | 02 | 2024 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $1,601 | $0 | n/a |
SU0560 # 09 Y:2024 | 09 | 2024 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $319 | $383 | n/a |
SU0560 # 03 Y:2024 | 03 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $815 | $0 | n/a |
SU0560 # 05 Y:2024 | 05 | 2024 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $363 | $0 | n/a |
SU0560 # 07 Y:2024 | 07 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,646 | $170 | n/a |
SU0560 # 08 Y:2024 | 08 | 2024 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,462 | $432 | n/a |
SU0560 # 06 Y:2024 | 06 | 2024 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $6,129 | $250 | n/a |
SU0560 # 04 Y:2024 | 04 | 2024 | PAY BILLS ON TIME TO AVOID LATE FEES | $797 | $0 | n/a |
UF0620 # 06 Y:2024 | 06 | 2024 | INSTALL TIMERS AND/OR THERMOSTATS | $2,156 | $350 | n/a |
UF0620 # 01 Y:2024 | 01 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $98,702 | $322,644 | n/a |
UF0620 # 03 Y:2024 | 03 | 2024 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $9,070 | $5,250 | n/a |
UF0620 # 04 Y:2024 | 04 | 2024 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $6,834 | $25,400 | n/a |
UF0620 # 10 Y:2024 | 10 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,038 | $0 | n/a |
UF0620 # 08 Y:2024 | 08 | 2024 | INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS | $1,958 | $2,120 | n/a |
UF0620 # 09 Y:2024 | 09 | 2024 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,209 | $0 | n/a |
UF0620 # 07 Y:2024 | 07 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,109 | $2,611 | n/a |
UF0620 # 02 Y:2024 | 02 | 2024 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $12,556 | $11,198 | n/a |
UF0620 # 05 Y:2024 | 05 | 2024 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $3,645 | $10,635 | n/a |
UF0620 # 11 Y:2024 | 11 | 2024 | DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS | $40,000 | $100,000 | n/a |
SU0553 # 03 Y:2024 | 03 | 2024 | RECOVER WASTE HEAT FROM EQUIPMENT | $7,580 | $118 | n/a |
SU0553 # 05 Y:2024 | 05 | 2024 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $1,809 | $75 | n/a |
SU0553 # 01 Y:2024 | 01 | 2024 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $7,750 | $0 | n/a |
SU0553 # 02 Y:2024 | 02 | 2024 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $36,557 | $168 | n/a |
SU0553 # 04 Y:2024 | 04 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,900 | $35 | n/a |