Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

47

matching recommendations
Reset
SIC 3823 Process Control Instruments
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0560 # 09 Y:2024 09 2024 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $319 $383 n/a
SU0560 # 08 Y:2024 08 2024 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,462 $432 n/a
SU0560 # 07 Y:2024 07 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,646 $170 n/a
SU0560 # 06 Y:2024 06 2024 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $6,129 $250 n/a
SU0560 # 05 Y:2024 05 2024 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $363 $0 n/a
SU0560 # 04 Y:2024 04 2024 PAY BILLS ON TIME TO AVOID LATE FEES $797 $0 n/a
SU0560 # 03 Y:2024 03 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $815 $0 n/a
SU0560 # 02 Y:2024 02 2024 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,601 $0 n/a
SU0560 # 01 Y:2024 01 2024 DISCONNECT BALLASTS $1,546 $0 n/a
SU0542 # 05 Y:2023 05 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,343 $4,218 Implemented
SU0542 # 01 Y:2023 01 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $6,088 $0 Not Implemented
SU0542 # 02 Y:2023 02 2023 RECOVER WASTE HEAT FROM EQUIPMENT $5,596 $390 Not Implemented
SU0542 # 03 Y:2023 03 2023 INSTALL / REPAIR INSULATION ON STEAM LINES $651 $85 Implemented
SU0542 # 04 Y:2023 04 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,404 $1,750 Implemented
SU0542 # 06 Y:2023 06 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $258 $250 Implemented
SU0542 # 07 Y:2023 07 2023 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $1,035 $1,460 Not Implemented
SU0539 # 04 Y:2023 04 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,490 $11,867 n/a
SU0539 # 03 Y:2023 03 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,866 $1,925 n/a
SU0539 # 02 Y:2023 02 2023 REDUCE VENTILATION AIR $10,262 $5,600 n/a
SU0539 # 01 Y:2023 01 2023 DISCONNECT BALLASTS $1,626 $0 n/a
SU0283 # 04 Y:2009 04 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,768 $182 Implemented
SU0283 # 07 Y:2009 07 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $86 $72 Not Implemented
SU0283 # 06 Y:2009 06 2009 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $257 $271 Not Implemented
SU0283 # 05 Y:2009 05 2009 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $715 $563 Implemented
SU0283 # 03 Y:2009 03 2009 TURN OFF EQUIPMENT WHEN NOT IN USE $5,551 $260 Implemented