IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

18

matching recommendations
Reset
SIC 384 Medical Instruments And Supplies
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0420 # 07 Y:1993 07 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $403 $512 Not Implemented
KU0420 # 06 Y:1993 06 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $427 $0 Not Implemented
KU0420 # 05 Y:1993 05 1993 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $126 $30 Not Implemented
KU0420 # 04 Y:1993 04 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $226 $113 Not Implemented
KU0420 # 03 Y:1993 03 1993 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $830 $630 Implemented
KU0420 # 02 Y:1993 02 1993 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,461 $2,079 Not Implemented
KU0420 # 01 Y:1993 01 1993 RECOVER WASTE HEAT FROM EQUIPMENT $5,244 $12,675 Not Implemented
KU0161 # 03 Y:1985 03 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $49 $40 Implemented
KU0161 # 04 Y:1985 04 1985 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $32 $65 Not Implemented
KU0161 # 02 Y:1985 02 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $182 $0 Implemented
KU0161 # 01 Y:1985 01 1985 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,195 $3,957 Implemented
KU0082 # 01 Y:1983 01 1983 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $893 $923 Not Implemented
KU0082 # 07 Y:1983 07 1983 REDUCE FLUID FLOW RATES $77 $8 Implemented
KU0082 # 06 Y:1983 06 1983 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $76 $0 Not Implemented
KU0082 # 05 Y:1983 05 1983 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $91 $40 Not Implemented
KU0082 # 04 Y:1983 04 1983 INSTALL AUTOMATIC STACK DAMPER $171 $336 Implemented
KU0082 # 03 Y:1983 03 1983 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $221 $200 Implemented
KU0082 # 02 Y:1983 02 1983 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $741 $147 Not Implemented