Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
18
matching recommendationsSIC | 384 | Medical Instruments And Supplies |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
KU0420 # 07 Y:1993 | 07 | 1993 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $403 | $512 | Not Implemented |
KU0420 # 06 Y:1993 | 06 | 1993 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $427 | $0 | Not Implemented |
KU0420 # 05 Y:1993 | 05 | 1993 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $126 | $30 | Not Implemented |
KU0420 # 04 Y:1993 | 04 | 1993 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $226 | $113 | Not Implemented |
KU0420 # 03 Y:1993 | 03 | 1993 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $830 | $630 | Implemented |
KU0420 # 02 Y:1993 | 02 | 1993 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,461 | $2,079 | Not Implemented |
KU0420 # 01 Y:1993 | 01 | 1993 | RECOVER WASTE HEAT FROM EQUIPMENT | $5,244 | $12,675 | Not Implemented |
KU0161 # 03 Y:1985 | 03 | 1985 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $49 | $40 | Implemented |
KU0161 # 04 Y:1985 | 04 | 1985 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $32 | $65 | Not Implemented |
KU0161 # 02 Y:1985 | 02 | 1985 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $182 | $0 | Implemented |
KU0161 # 01 Y:1985 | 01 | 1985 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $3,195 | $3,957 | Implemented |
KU0082 # 01 Y:1983 | 01 | 1983 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $893 | $923 | Not Implemented |
KU0082 # 07 Y:1983 | 07 | 1983 | REDUCE FLUID FLOW RATES | $77 | $8 | Implemented |
KU0082 # 06 Y:1983 | 06 | 1983 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $76 | $0 | Not Implemented |
KU0082 # 05 Y:1983 | 05 | 1983 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $91 | $40 | Not Implemented |
KU0082 # 04 Y:1983 | 04 | 1983 | INSTALL AUTOMATIC STACK DAMPER | $171 | $336 | Implemented |
KU0082 # 03 Y:1983 | 03 | 1983 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $221 | $200 | Implemented |
KU0082 # 02 Y:1983 | 02 | 1983 | MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE | $741 | $147 | Not Implemented |