IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,534

matching recommendations
Reset
SIC 39 Miscellaneous Manufacturing Industries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0222 # 05 Y:1991 05 1991 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $259 $181 Not Implemented
MA0222 # 06 Y:1991 06 1991 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $169 $78 Implemented
TN0433 # 01 Y:1991 01 1991 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,552 $3,000 Implemented
TN0433 # 02 Y:1991 02 1991 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $11,102 $19,000 Implemented
TN0433 # 03 Y:1991 03 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $152 $152 Implemented
TN0433 # 04 Y:1991 04 1991 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $802 $180 Implemented
TN0433 # 05 Y:1991 05 1991 USE COMPRESSOR AIR FILTERS $629 $25 Implemented
TN0433 # 06 Y:1991 06 1991 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $22,993 $75,000 Implemented
OK0341 # 01 Y:1991 01 1991 INSTALL TIMERS AND/OR THERMOSTATS $355 $245 Implemented
OK0341 # 02 Y:1991 02 1991 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,004 $6,200 Implemented
OK0341 # 03 Y:1991 03 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,241 $791 Implemented
OK0341 # 04 Y:1991 04 1991 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $14,080 $38,500 Implemented
OK0341 # 05 Y:1991 05 1991 INSTALL TIMERS AND/OR THERMOSTATS $1,481 $1,800 Implemented
OK0341 # 06 Y:1991 06 1991 INSTALL SET-BACK TIMERS $19,001 $13,510 Implemented
OK0341 # 07 Y:1991 07 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $846 $1,336 Implemented
OK0341 # 08 Y:1991 08 1991 REPAIR AND ELIMINATE STEAM LEAKS $443 $740 Implemented
OK0341 # 09 Y:1991 09 1991 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,226 $2,900 Implemented
OK0341 # 10 Y:1991 10 1991 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $26,053 $16,500 Implemented
MA0202 # 01 Y:1991 01 1991 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $458 $1,012 Implemented
MA0202 # 02 Y:1991 02 1991 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $2,469 $2,800 Implemented
MA0202 # 03 Y:1991 03 1991 INSULATE BARE EQUIPMENT $196 $0 Implemented
MA0202 # 04 Y:1991 04 1991 REDUCE HEAT GAIN BY WINDOW TINTING $9,467 $37,380 Implemented
MO0016 # 01 Y:1991 01 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $164 $45 Implemented
MO0016 # 02 Y:1991 02 1991 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $440 $1,095 Implemented
MO0016 # 03 Y:1991 03 1991 INSTALL / REPAIR INSULATION ON STEAM LINES $383 $1,145 Implemented