Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
112
matching recommendationsSIC | 3931 | Musical Instruments |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AR0047 # 02 Y:1995 | 02 | 1995 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,614 | $765 | Implemented |
AR0047 # 03 Y:1995 | 03 | 1995 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,365 | $600 | Implemented |
AR0047 # 04 Y:1995 | 04 | 1995 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $655 | $150 | Implemented |
AR0047 # 05 Y:1995 | 05 | 1995 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,083 | $1,000 | Implemented |
HO0056 # 01 Y:1993 | 01 | 1993 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,219 | $6,176 | Not Implemented |
HO0056 # 02 Y:1993 | 02 | 1993 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $886 | $3,887 | Not Implemented |
HO0056 # 03 Y:1993 | 03 | 1993 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $123 | $578 | Not Implemented |
HO0056 # 04 Y:1993 | 04 | 1993 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $356 | $1,000 | Not Implemented |
ST0063 # 01 Y:1986 | 01 | 1986 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $347 | $102 | Implemented |
ST0063 # 02 Y:1986 | 02 | 1986 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $518 | $0 | Implemented |
ST0063 # 03 Y:1986 | 03 | 1986 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,096 | $537 | Implemented |
ST0063 # 04 Y:1986 | 04 | 1986 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,600 | $783 | Not Implemented |
ST0063 # 05 Y:1986 | 05 | 1986 | CHANGE ZONE REHEAT COILS TO VARIABLE AIR VOLUME BOXES | $11,118 | $20,000 | Not Implemented |
ST0063 # 06 Y:1986 | 06 | 1986 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $289 | $0 | Implemented |
ST0063 # 07 Y:1986 | 07 | 1986 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $2,593 | $8,000 | Not Implemented |
ST0063 # 08 Y:1986 | 08 | 1986 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,371 | $4,000 | Not Implemented |
GT0264 # 01 Y:1985 | 01 | 1985 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,470 | $1,000 | Implemented |
GT0264 # 02 Y:1985 | 02 | 1985 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $1,370 | $8,000 | Implemented |
GT0264 # 03 Y:1985 | 03 | 1985 | REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF | $9,370 | $41,000 | Implemented |
GT0264 # 04 Y:1985 | 04 | 1985 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $294 | $2,198 | Implemented |
GT0264 # 05 Y:1985 | 05 | 1985 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $320 | $0 | Implemented |
GT0264 # 06 Y:1985 | 06 | 1985 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,130 | $5,500 | Implemented |
GT0264 # 07 Y:1985 | 07 | 1985 | USE MINIMUM SAFE OVEN VENTILATION | $1,190 | $800 | Not Implemented |
GT0264 # 08 Y:1985 | 08 | 1985 | UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING | $2,920 | $5,000 | Implemented |
ST0008 # 01 Y:1984 | 01 | 1984 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $317 | $0 | Not Implemented |