IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

15

matching recommendations
Reset
SIC 3949 Sporting And Athletic Goods, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0353 # 01 Y:1991 01 1991 USE ONLY AMOUNT OF PACKAGING MATERIAL NECESSARY $26,522 $0 Implemented
KU0353 # 02 Y:1991 02 1991 RECOVER AND REUSE COOLING WATER $603 $0 Implemented
KU0353 # 03 Y:1991 03 1991 RECOVER WASTE HEAT FROM EQUIPMENT $2,291 $2,400 Implemented
KU0353 # 04 Y:1991 04 1991 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $752 $120 Implemented
KU0353 # 05 Y:1991 05 1991 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $386 $420 Implemented
KU0353 # 06 Y:1991 06 1991 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $315 $175 Implemented
KU0353 # 07 Y:1991 07 1991 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $297 $1,000 Implemented
KU0353 # 08 Y:1991 08 1991 INSTALL SET-BACK TIMERS $1,871 $300 Implemented
KU0353 # 09 Y:1991 09 1991 REDUCE GLAZED AREAS IN BUILDINGS $1,259 $1,105 Implemented
TN0433 # 01 Y:1991 01 1991 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,552 $3,000 Implemented
TN0433 # 02 Y:1991 02 1991 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $11,102 $19,000 Implemented
TN0433 # 03 Y:1991 03 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $152 $152 Implemented
TN0433 # 04 Y:1991 04 1991 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $802 $180 Implemented
TN0433 # 05 Y:1991 05 1991 USE COMPRESSOR AIR FILTERS $629 $25 Implemented
TN0433 # 06 Y:1991 06 1991 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $22,993 $75,000 Implemented