IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

629

matching recommendations
Reset
SIC 399 Miscellaneous Manufactures
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0489 # 04 Y:1993 04 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,410 $9,100 Implemented
WI0162 # 07 Y:1992 07 1992 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $265 $0 Implemented
WI0162 # 08 Y:1992 08 1992 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $215 $150 Implemented
WI0162 # 09 Y:1992 09 1992 INSULATE BARE EQUIPMENT $139 $480 Implemented
WI0162 # 05 Y:1992 05 1992 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $152 $500 Implemented
WI0162 # 04 Y:1992 04 1992 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $774 $1,280 Implemented
WI0162 # 01 Y:1992 01 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,560 $5 Implemented
MO0065 # 05 Y:1992 05 1992 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $797 $790 Implemented
MO0065 # 07 Y:1992 07 1992 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $91 $20 Implemented
HO0014 # 01 Y:1992 01 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,325 $116 Implemented
HO0014 # 02 Y:1992 02 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $432 $442 Implemented
HO0014 # 03 Y:1992 03 1992 INSTALL / REPAIR INSULATION ON STEAM LINES $121 $104 Implemented
HO0014 # 04 Y:1992 04 1992 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $292 $321 Implemented
HO0014 # 05 Y:1992 05 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,292 $6,380 Implemented
HO0014 # 06 Y:1992 06 1992 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,244 $800 Implemented
HO0014 # 07 Y:1992 07 1992 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $28,170 $72,000 Implemented
HO0014 # 09 Y:1992 09 1992 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $1,019 $260 Implemented
UD0357 # 01 Y:1991 01 1991 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,022 $0 Implemented
UD0357 # 02 Y:1991 02 1991 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $8,700 $0 Implemented
UD0357 # 03 Y:1991 03 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $729 $0 Implemented
UD0357 # 04 Y:1991 04 1991 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $228 $500 Implemented
UD0357 # 05 Y:1991 05 1991 RECOVER WASTE HEAT FROM EQUIPMENT $194 $1,000 Implemented
MA0222 # 02 Y:1991 02 1991 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $2,144 $500 Implemented
MA0222 # 03 Y:1991 03 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $215 $1,419 Implemented
MA0222 # 04 Y:1991 04 1991 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $504 $0 Implemented