Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
147
matching recommendationsSIC | 42 | Trucking And Warehousing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AS0554 # 02 Y:2023 | 02 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,520 | $2,832 | Implemented |
WV0638 # 02 Y:2023 | 02 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,432 | $10,200 | Implemented |
WV0638 # 01 Y:2023 | 01 | 2023 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $9,119 | $41,800 | Not Implemented |
WV0638 # 05 Y:2023 | 05 | 2023 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $923 | $2,323 | Not Implemented |
WV0638 # 08 Y:2023 | 08 | 2023 | UPGRADE CONTROLS ON COMPRESSORS | $484 | $2,350 | Not Implemented |
WV0638 # 07 Y:2023 | 07 | 2023 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $631 | $2,910 | Implemented |
WV0638 # 06 Y:2023 | 06 | 2023 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $674 | $2,060 | Implemented |
WV0638 # 03 Y:2023 | 03 | 2023 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $7,943 | $18,226 | Not Implemented |
WV0638 # 04 Y:2023 | 04 | 2023 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $2,424 | $11,600 | Implemented |
WV0638 # 09 Y:2023 | 09 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $90 | $100 | Implemented |
AM0867 # 05 Y:2023 | 05 | 2023 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $34,000 | $10,000 | Not Implemented |
WM0186 # 02 Y:2023 | 02 | 2023 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $25,831 | $10,920 | Not Implemented |
WM0186 # 04 Y:2023 | 04 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,467 | $0 | Implemented |
AM0867 # 06 Y:2023 | 06 | 2023 | OPTIMIZE PLANT POWER FACTOR | $23,500 | $87,830 | Not Implemented |
WM0186 # 03 Y:2023 | 03 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,140 | $5,250 | Implemented |
WM0186 # 01 Y:2023 | 01 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $99,547 | $82,860 | Implemented |
AM0867 # 02 Y:2023 | 02 | 2023 | LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT | $263,000 | $452,400 | Implemented |
AM0867 # 03 Y:2023 | 03 | 2023 | REPAIR OR REPLACE STEAM TRAPS | $109,400 | $10,100 | Not Implemented |
AM0867 # 04 Y:2023 | 04 | 2023 | REDUCE EXCESSIVE BOILER BLOWDOWN | $67,910 | $12,000 | Not Implemented |
AM0867 # 01 Y:2023 | 01 | 2023 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS | $259,000 | $25,200 | Not Implemented |
WM0186 # 05 Y:2023 | 05 | 2023 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $786 | $1,537 | Not Implemented |
WM0186 # 07 Y:2023 | 07 | 2023 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $230 | $326 | Not Implemented |
WM0186 # 06 Y:2023 | 06 | 2023 | USE COMPRESSOR AIR FILTERS | $643 | $2,773 | Not Implemented |
LS0523 # 01 Y:2023 | 01 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $934 | $25 | Not Implemented |
LS0523 # 04 Y:2023 | 04 | 2023 | USE PHOTOCELL CONTROLS | $666 | $148 | Implemented |