IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

556

matching recommendations
Reset
SIC 494 Water Supply
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IP0117 # 01 Y:2019 01 2019 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,422 $412 Implemented
IP0117 # 02 Y:2019 02 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,275 $9,350 Implemented
IP0117 # 03 Y:2019 03 2019 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $3,315 $17,500 Not Implemented
IP0117 # 04 Y:2019 04 2019 USE SOLAR HEAT TO MAKE ELECTRICTY $23,331 $134,106 Not Implemented
IP0116 # 01 Y:2019 01 2019 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $308 $0 Implemented
IP0116 # 02 Y:2019 02 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,151 $23 Not Implemented
IP0116 # 03 Y:2019 03 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $415 $680 Not Implemented
IP0116 # 04 Y:2019 04 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,878 $14,599 Implemented
IP0116 # 05 Y:2019 05 2019 USE SOLAR HEAT TO MAKE ELECTRICTY $117,376 $1,431,096 Implemented
SF0536 # 01 Y:2019 01 2019 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,886 $0 Implemented
SF0536 # 02 Y:2019 02 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,261 $16,688 Implemented
SF0536 # 03 Y:2019 03 2019 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $47,766 $327,497 Not Implemented
SF0536 # 04 Y:2019 04 2019 USE SOLAR HEAT TO MAKE ELECTRICTY $78,553 $677,569 Not Implemented
UD0991 # 01 Y:2019 01 2019 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $16,716 $0 Not Implemented
UD0991 # 02 Y:2019 02 2019 USE POWER DURING OFF-PEAK PERIODS $15,085 $0 Implemented
UD0991 # 03 Y:2019 03 2019 MINIMIZE WATER USAGE $10,365 $0 Not Implemented
UD0991 # 04 Y:2019 04 2019 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $1,066 $0 Not Implemented
MA0796 # 01 Y:2019 01 2019 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $4,315 $14,350 Not Implemented
MA0796 # 02 Y:2019 02 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,245 $6,660 Not Implemented
MA0796 # 03 Y:2019 03 2019 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $3,193 $200 Implemented
MA0796 # 04 Y:2019 04 2019 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $1,678 $300 Not Implemented
MA0796 # 05 Y:2019 05 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,405 $2,499 Implemented
MA0796 # 06 Y:2019 06 2019 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $634 $200 Implemented
UU0141 # 01 Y:2019 01 2019 CLOSELY MONITOR CHEMICAL ADDITIONS TO INCREASE BATH LIFE $377,727 $30 Not Implemented
UU0141 # 02 Y:2019 02 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $176,898 $256,282 Implemented