IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

243

matching recommendations
Reset
SIC 51 Wholesale Tradenondurable Goods
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0399 # 05 Y:2011 05 2011 RECOVER WASTE HEAT FROM EQUIPMENT $42,675 $101,238 Not Implemented
SF0399 # 06 Y:2011 06 2011 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $835 $2,209 Not Implemented
SF0399 # 07 Y:2011 07 2011 INSULATE BARE EQUIPMENT $1,028 $4,855 Not Implemented
SF0399 # 08 Y:2011 08 2011 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $31,982 $112,500 Not Implemented
SF0399 # 09 Y:2011 09 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $78,758 $307,524 Implemented
SF0399 # 10 Y:2011 10 2011 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $6,800 $37,014 Not Implemented
SF0399 # 11 Y:2011 11 2011 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $18,286 $77,335 Not Implemented
SF0399 # 12 Y:2011 12 2011 INSTALL OCCUPANCY SENSORS $5,862 $26,604 Implemented
SF0399 # 13 Y:2011 13 2011 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $11,038 $65,479 Not Implemented
SF0399 # 14 Y:2011 14 2011 ADOPT IN-HOUSE MATERIAL GENERATION $38,710 $49,256 Not Implemented
MI0185 # 01 Y:2009 01 2009 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $123,100 $64,000 Not Implemented
MI0185 # 02 Y:2009 02 2009 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $83,014 $1,500 Implemented
MI0185 # 03 Y:2009 03 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $37,375 $60 Implemented
MI0185 # 04 Y:2009 04 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $18,482 $920 Implemented
MI0185 # 05 Y:2009 05 2009 REPAIR OR REPLACE STEAM TRAPS $12,330 $800 Implemented
MI0185 # 06 Y:2009 06 2009 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $5,182 $640 Implemented
UF0423 # 01 Y:2009 01 2009 INSULATE BARE EQUIPMENT $7,135 $12,571 Not Implemented
UF0423 # 02 Y:2009 02 2009 USE OPTIMUM TEMPERATURE $45,100 $0 Not Implemented
UF0423 # 03 Y:2009 03 2009 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,442 $600 Implemented
UF0423 # 04 Y:2009 04 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $31,606 $38,839 Not Implemented
UF0423 # 05 Y:2009 05 2009 REDESIGN PROCESS $206,074 $300,000 Not Implemented
UF0423 # 06 Y:2009 06 2009 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $753 $0 Implemented
UF0423 # 07 Y:2009 07 2009 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $5,505 $2,503 Not Implemented
UF0423 # 08 Y:2009 08 2009 INSTALL OCCUPANCY SENSORS $495 $315 Not Implemented
UF0423 # 09 Y:2009 09 2009 RECYCLE FLUORESCENT LAMPS $2,671 $3,405 Not Implemented