IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

115

matching recommendations
Reset
SIC 514 Groceries And Related Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0399 # 10 Y:2011 10 2011 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $6,800 $37,014 Not Implemented
SF0399 # 11 Y:2011 11 2011 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $18,286 $77,335 Not Implemented
SF0399 # 12 Y:2011 12 2011 INSTALL OCCUPANCY SENSORS $5,862 $26,604 Implemented
SF0399 # 13 Y:2011 13 2011 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $11,038 $65,479 Not Implemented
SF0399 # 14 Y:2011 14 2011 ADOPT IN-HOUSE MATERIAL GENERATION $38,710 $49,256 Not Implemented
OR0538 # 01 Y:2008 01 2008 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $113,818 $1,600 Not Implemented
OR0538 # 02 Y:2008 02 2008 USE OPTIMUM THICKNESS INSULATION $15,451 $3,248 Not Implemented
OR0538 # 03 Y:2008 03 2008 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $433,305 $300,000 Not Implemented
OR0538 # 04 Y:2008 04 2008 INSTALL SENSORS TO DETECT DEFECTS $132,288 $140,000 Not Implemented
OR0538 # 05 Y:2008 05 2008 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $9,546 $7,085 Not Implemented
OR0538 # 06 Y:2008 06 2008 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $16,035 $16,204 Not Implemented
IA0424 # 01 Y:2008 01 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $333 $13 Implemented
IA0424 # 02 Y:2008 02 2008 INSTALL SPECTRAL REFLECTORS / DELAMP $2,811 $134 Not Implemented
IA0424 # 03 Y:2008 03 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,627 $3,004 Implemented
IA0424 # 04 Y:2008 04 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,324 $4,198 Not Implemented
IA0424 # 05 Y:2008 05 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,992 $7,650 Implemented
IA0424 # 06 Y:2008 06 2008 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $801 $780 Implemented
IC0132 # 01 Y:2007 01 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $906 $0 Implemented
IC0132 # 02 Y:2007 02 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,349 $3,349 Not Implemented
IC0132 # 03 Y:2007 03 2007 OPTIMIZE PLANT POWER FACTOR $8,296 $19,530 Implemented
IC0132 # 04 Y:2007 04 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,356 $6,527 Not Implemented
IC0132 # 05 Y:2007 05 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $71 $147 Not Implemented
IC0132 # 06 Y:2007 06 2007 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $654 $1,962 Implemented
IC0132 # 07 Y:2007 07 2007 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $396 $0 Implemented
IC0132 # 08 Y:2007 08 2007 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $860 $0 Not Implemented