IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

28

matching recommendations
Reset
SIC 54 Food Stores
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0573 # 02 Y:2024 02 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $30,296 $280,927 n/a
AS0573 # 03 Y:2024 03 2024 INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS $2,286 $26,500 n/a
AS0573 # 04 Y:2024 04 2024 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $219 $144 n/a
AS0573 # 01 Y:2024 01 2024 USE BATTERY STORAGE FOR DEMAND CONTROL $67,584 $135,000 n/a
MS0403 # 01 Y:2022 01 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,116 $2,579 Implemented
MS0403 # 02 Y:2022 02 2022 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $1,349 $105 Not Implemented
MS0403 # 03 Y:2022 03 2022 INSTALL OCCUPANCY SENSORS $298 $324 Not Implemented
MS0403 # 04 Y:2022 04 2022 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $881 $5,800 Not Implemented
MS0403 # 05 Y:2022 05 2022 UPGRADE OBSOLETE EQUIPMENT $300 $3,768 Implemented
SD0449 # 01 Y:2012 01 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,392 $100 Implemented
SD0449 # 08 Y:2012 08 2012 OPTIMIZE PLANT POWER FACTOR $3,189 $5,775 Not Implemented
SD0449 # 07 Y:2012 07 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,186 $2,022 Implemented
SD0449 # 06 Y:2012 06 2012 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $865 $1,500 Implemented
SD0449 # 05 Y:2012 05 2012 INSTALL OCCUPANCY SENSORS $1,629 $2,471 Not Implemented
SD0449 # 04 Y:2012 04 2012 REPAIR AND ELIMINATE STEAM LEAKS $4,456 $1,200 Implemented
SD0449 # 03 Y:2012 03 2012 REPAIR AND ELIMINATE STEAM LEAKS $1,042 $200 Implemented
SD0449 # 02 Y:2012 02 2012 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $3,454 $100 Not Implemented
LL0319 # 05 Y:2009 05 2009 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $156 $156 Not Implemented
LL0319 # 04 Y:2009 04 2009 REDUCE HEAT GAIN BY WINDOW TINTING $248 $520 Implemented
LL0319 # 03 Y:2009 03 2009 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $997 $360 Implemented
LL0319 # 02 Y:2009 02 2009 INSULATE BARE EQUIPMENT $1,552 $1,624 Implemented
LL0319 # 01 Y:2009 01 2009 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $2,714 $225 Not Implemented
UW0021 # 01 Y:2008 01 2008 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS $52,486 $175,000 Not Implemented
UW0021 # 02 Y:2008 02 2008 OPERATE BOILERS ON HIGH FIRE SETTING $20,223 $49,000 Not Implemented
UW0021 # 03 Y:2008 03 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,357 $5,912 Not Implemented