IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

22

matching recommendations
Reset
SIC 5511 New And Used Car Dealers
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NT0025 # 06 Y:2024 06 2024 CHANGE OPERATING CONDITIONS $150,000 $1,200,000 n/a
NT0025 # 05 Y:2024 05 2024 OPTIMIZE PLANT POWER FACTOR $2,643 $1,302 n/a
NT0025 # 04 Y:2024 04 2024 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $36,410 $21,995 n/a
NT0025 # 03 Y:2024 03 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,511 $906 n/a
NT0025 # 02 Y:2024 02 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,914 $5,609 n/a
NT0025 # 01 Y:2024 01 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,136 $0 n/a
MUCM05 # 02 Y:2022 02 2022 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $40 $0 Not Implemented
MUCM05 # 07 Y:2022 07 2022 USE PHOTOCELL CONTROLS $297 $1,146 Not Implemented
MUCM05 # 06 Y:2022 06 2022 INSTALL OCCUPANCY SENSORS $250 $195 Not Implemented
MUCM05 # 05 Y:2022 05 2022 TURN OFF EQUIPMENT WHEN NOT IN USE $2,554 $0 Implemented
MUCM05 # 04 Y:2022 04 2022 TURN OFF EQUIPMENT WHEN NOT IN USE $495 $0 Not Implemented
MUCM05 # 03 Y:2022 03 2022 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,312 $0 Not Implemented
MUCM05 # 01 Y:2022 01 2022 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $7,550 $0 Not Implemented
UF0421 # 01 Y:2009 01 2009 INSTALL OCCUPANCY SENSORS $4,519 $1,280 Not Implemented
UF0421 # 02 Y:2009 02 2009 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $31,204 $62,181 Not Implemented
UF0421 # 03 Y:2009 03 2009 INSTALL COMMON HEADER ON COMPRESSORS $2,293 $0 Implemented
UF0421 # 04 Y:2009 04 2009 INSTALL SKYLIGHTS $1,691 $11,790 Not Implemented
UF0421 # 05 Y:2009 05 2009 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $3,680 $2,262 Not Implemented
UF0421 # 06 Y:2009 06 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,375 $8,700 Not Implemented
UF0421 # 07 Y:2009 07 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,873 $515 Implemented
UF0421 # 08 Y:2009 08 2009 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $16,017 $0 Not Implemented
UF0421 # 09 Y:2009 09 2009 DEVELOP A REPAIR/REPLACE POLICY $2,717 $0 Not Implemented