IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

17

matching recommendations
Reset
SIC 82 Educational Services
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UU0226 # 03 Y:2023 03 2023 USE OPTIMUM TEMPERATURE $2,090 $2,000 Implemented
UU0226 # 02 Y:2023 02 2023 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $3,162 $2,000 Implemented
UU0226 # 01 Y:2023 01 2023 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $10,910 $800 Implemented
UU0174 # 01 Y:2021 01 2021 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $24,060 $178,852 Implemented
UU0174 # 02 Y:2021 02 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,383 $85,347 Implemented
UU0174 # 04 Y:2021 04 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $744 $200 Implemented
UU0165 # 04 Y:2020 04 2020 AIR CONDITION ONLY SPACE NECESSARY $1,220 $1,500 Implemented
UU0165 # 05 Y:2020 05 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $660 $660 Implemented
UU0162 # 03 Y:2020 03 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,096 $5,759 Implemented
UU0162 # 04 Y:2020 04 2020 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $328 $1,141 Implemented
UU0162 # 01 Y:2020 01 2020 REDUCE FLUID FLOW RATES $8,259 $17,871 Implemented
UU0130 # 01 Y:2018 01 2018 REDUCE VENTILATION AIR $13,209 $0 Implemented
UU0130 # 02 Y:2018 02 2018 REDUCE VENTILATION AIR $12,820 $0 Implemented
UU0130 # 03 Y:2018 03 2018 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $11,365 $800 Implemented
UU0130 # 04 Y:2018 04 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,216 $11,463 Implemented
UU0130 # 05 Y:2018 05 2018 INSTALL OCCUPANCY SENSORS $4,166 $2,026 Implemented
UU0130 # 06 Y:2018 06 2018 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $2,996 $0 Implemented