Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
329
matching recommendationsSIC | 821 | Elementary And Secondary Schools |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AM0920 # 01 Y:2024 | 01 | 2024 | USE DOUBLE OR TRIPLE GLAZED WINDOWS TO MAINTAIN HIGHER RELATIVE HUMIDITY AND TO REDUCE HEAT LOSSES | $903 | $35,477 | n/a |
AM0920 # 02 Y:2024 | 02 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $20,630 | $460,200 | n/a |
AM0920 # 03 Y:2024 | 03 | 2024 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $6,640 | $7,500 | n/a |
AM0920 # 04 Y:2024 | 04 | 2024 | REPAIR FAULTY LOUVERS AND DAMPERS | $4,125 | $9,000 | n/a |
AM0920 # 05 Y:2024 | 05 | 2024 | INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION | $1,403 | $1,000 | n/a |
AM0919 # 01 Y:2024 | 01 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,964 | $20,366 | n/a |
AM0919 # 02 Y:2024 | 02 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $19,780 | $468,000 | n/a |
AM0919 # 03 Y:2024 | 03 | 2024 | REDUCE FLUID FLOW RATES | $1,498 | $3,000 | n/a |
AM0919 # 04 Y:2024 | 04 | 2024 | ELIMINATE LEAKS IN WATER LINES AND VALVES | $3,503 | $2,500 | n/a |
AM0919 # 05 Y:2024 | 05 | 2024 | INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION | $317 | $1,000 | n/a |
AM0918 # 01 Y:2024 | 01 | 2024 | REDUCE FLUID FLOW RATES | $1,310 | $3,000 | n/a |
AM0918 # 02 Y:2024 | 02 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $25,377 | $489,840 | n/a |
AM0918 # 03 Y:2024 | 03 | 2024 | REPAIR FAULTY LOUVERS AND DAMPERS | $412 | $3,000 | n/a |
AM0918 # 04 Y:2024 | 04 | 2024 | INSTALL OCCUPANCY SENSORS | $2,244 | $1,215 | n/a |
AM0918 # 05 Y:2024 | 05 | 2024 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $1,601 | $3,000 | n/a |
AM0917 # 01 Y:2024 | 01 | 2024 | ELIMINATE LEAKS IN WATER LINES AND VALVES | $362 | $3,000 | n/a |
AM0917 # 02 Y:2024 | 02 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $21,840 | $468,000 | n/a |
AM0917 # 03 Y:2024 | 03 | 2024 | INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS | $21 | $300 | n/a |
AM0917 # 04 Y:2024 | 04 | 2024 | INSTALL OCCUPANCY SENSORS | $77 | $1,470 | n/a |
CI0028 # 08 Y:2024 | 08 | 2024 | REPLACE BOILER | $1,659 | $8,000 | n/a |
CI0028 # 07 Y:2024 | 07 | 2024 | MINIMIZE WATER USAGE | $5,321 | $22,000 | n/a |
CI0028 # 06 Y:2024 | 06 | 2024 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $5,530 | $11,000 | n/a |
CI0028 # 05 Y:2024 | 05 | 2024 | INSTALL OCCUPANCY SENSORS | $5,668 | $5,200 | n/a |
CI0028 # 03 Y:2024 | 03 | 2024 | USE DOUBLE OR TRIPLE GLAZED WINDOWS TO MAINTAIN HIGHER RELATIVE HUMIDITY AND TO REDUCE HEAT LOSSES | $14,256 | $92,800 | n/a |
CI0028 # 02 Y:2024 | 02 | 2024 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $43,415 | $1,900 | n/a |