IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

142,596

matching recommendations
Reset
ARC 2 ENERGY MANAGEMENT
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IP0169 # 14 Y:2023 14 2023 DISCONNECT BALLASTS $7 $20 Implemented
IP0169 # 15 Y:2023 15 2023 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $10,836 $47,613 Not Implemented
CC0013 # 01 Y:2023 01 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,074 $0 n/a
CC0013 # 02 Y:2023 02 2023 TURN OFF EQUIPMENT WHEN NOT IN USE $1,363 $0 n/a
CC0013 # 03 Y:2023 03 2023 HEAT WATER DURING OFF-PEAK PERIODS AND STORE FOR LATER USE $4,697 $8,400 n/a
CC0013 # 04 Y:2023 04 2023 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $21,990 $40,000 n/a
CC0013 # 05 Y:2023 05 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $33,597 $180,600 n/a
DL0220 # 01 Y:2023 01 2023 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $84,324 $0 Implemented
DL0220 # 02 Y:2023 02 2023 USE OPTIMUM TEMPERATURE $6,980 $0 Implemented
DL0220 # 03 Y:2023 03 2023 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $4,020 $0 Not Implemented
DL0220 # 04 Y:2023 04 2023 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $10,928 $0 Not Implemented
DL0220 # 05 Y:2023 05 2023 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $16,704 $0 Not Implemented
DL0220 # 06 Y:2023 06 2023 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $14,418 $0 Not Implemented
DL0220 # 07 Y:2023 07 2023 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $3,578 $0 Not Implemented
DL0220 # 08 Y:2023 08 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,694 $0 Not Implemented
DL0220 # 09 Y:2023 09 2023 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $6,332 $20,000 Not Implemented
DL0220 # 10 Y:2023 10 2023 RECOVER WASTE HEAT FROM EQUIPMENT $6,153 $9,740 Not Implemented
DL0220 # 11 Y:2023 11 2023 RECOVER WASTE HEAT FROM EQUIPMENT $1,387 $6,500 Not Implemented
DL0220 # 12 Y:2023 12 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,150 $8,994 Implemented
CW0126 # 01 Y:2022 01 2022 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $17,675 $20,960 n/a
CW0126 # 02 Y:2022 02 2022 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $12,461 $15,547 n/a
CW0126 # 03 Y:2022 03 2022 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $361 $0 n/a
CW0126 # 04 Y:2022 04 2022 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $19,047 $54,963 n/a
CW0126 # 05 Y:2022 05 2022 ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION $10,872 $33,000 n/a
CW0126 # 06 Y:2022 06 2022 USE POWER DURING OFF-PEAK PERIODS $921 $0 n/a