IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

143,508

matching recommendations
Reset
ARC 2 ENERGY MANAGEMENT
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0019 # 05 Y:1985 05 1985 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $2,572 $4,000 Not Implemented
CO0019 # 06 Y:1985 06 1985 RECOVER WASTE HEAT FROM EQUIPMENT $657 $1,200 Not Implemented
CO0019 # 07 Y:1985 07 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $568 $30 Not Implemented
CO0020 # 01 Y:1985 01 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,993 $2,632 Implemented
CO0020 # 02 Y:1985 02 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,084 $350 Implemented
CO0020 # 03 Y:1985 03 1985 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER $689 $450 Implemented
CO0020 # 04 Y:1985 04 1985 USE DEMAND CONTROLLER OR LOAD SHEDDER $1,378 $1,800 Implemented
CO0020 # 05 Y:1985 05 1985 INSTALL TIMERS AND/OR THERMOSTATS $2,105 $420 Not Implemented
CO0020 # 06 Y:1985 06 1985 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $1,951 $4,000 Implemented
TS0009 # 01 Y:1985 01 1985 UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING $14,940 $8,000 Not Implemented
TS0009 # 02 Y:1985 02 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $111 $10 Not Implemented
TS0009 # 03 Y:1985 03 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,498 $0 Not Implemented
TS0009 # 04 Y:1985 04 1985 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $2,460 $1,200 Not Implemented
TS0009 # 05 Y:1985 05 1985 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $400 $0 Not Implemented
TS0009 # 06 Y:1985 06 1985 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $581 $600 Not Implemented
TS0018 # 01 Y:1985 01 1985 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $14,252 $23,421 Not Implemented
TS0018 # 02 Y:1985 02 1985 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $11,124 $0 Not Implemented
TS0018 # 03 Y:1985 03 1985 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $4,974 $5,200 Not Implemented
UD0151 # 01 Y:1985 01 1985 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $162 $0 Not Implemented
UD0151 # 02 Y:1985 02 1985 INSULATE BARE EQUIPMENT $1,349 $315 Implemented
UD0151 # 03 Y:1985 03 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $795 $284 Not Implemented
UD0152 # 01 Y:1985 01 1985 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,247 $0 Not Implemented
UD0152 # 02 Y:1985 02 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $749 $99 Implemented
MA0016 # 01 Y:1985 01 1985 AIR CONDITION ONLY SPACE NECESSARY $7,772 $5,000 Implemented
MA0016 # 02 Y:1985 02 1985 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $1,480 $3,178 Implemented