IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

141,520

matching recommendations
Reset
ARC 2 ENERGY MANAGEMENT
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0019 # 03 Y:1982 03 1982 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $539 $570 Implemented
OK0020 # 01 Y:1982 01 1982 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $767 $30 Implemented
KU0030 # 01 Y:1982 01 1982 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $740 $100 Not Implemented
KU0030 # 02 Y:1982 02 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,997 $3,000 Not Implemented
KU0030 # 03 Y:1982 03 1982 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $439 $0 Not Implemented
KU0030 # 04 Y:1982 04 1982 INSTALL TIMERS AND/OR THERMOSTATS $1,297 $500 Not Implemented
KU0030 # 05 Y:1982 05 1982 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $3,146 $3,500 Not Implemented
KU0030 # 06 Y:1982 06 1982 REDESIGN PROCESS $11,311 $80,000 Not Implemented
KU0031 # 01 Y:1982 01 1982 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $368 $450 Not Implemented
KU0031 # 02 Y:1982 02 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,393 $725 Not Implemented
KU0031 # 03 Y:1982 03 1982 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,083 $3,000 Not Implemented
KU0031 # 04 Y:1982 04 1982 INSTALL / REPAIR INSULATION ON STEAM LINES $3,474 $1,010 Not Implemented
KU0031 # 05 Y:1982 05 1982 REPAIR AND ELIMINATE STEAM LEAKS $10,740 $750 Not Implemented
KU0032 # 01 Y:1982 01 1982 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $14,570 $0 Not Implemented
KU0032 # 02 Y:1982 02 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,434 $0 Not Implemented
KU0032 # 03 Y:1982 03 1982 INSULATE BARE EQUIPMENT $3,756 $475 Not Implemented
KU0032 # 04 Y:1982 04 1982 INSTALL STORM WINDOWS AND DOORS $1,984 $568 Not Implemented
KU0032 # 05 Y:1982 05 1982 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $28,113 $40,000 Not Implemented
KU0033 # 01 Y:1982 01 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,443 $3,935 Implemented
KU0033 # 02 Y:1982 02 1982 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $1,573 $0 Implemented
KU0033 # 03 Y:1982 03 1982 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $509 $700 Implemented
KU0033 # 04 Y:1982 04 1982 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $69 $0 Implemented
UD0022 # 02 Y:1982 02 1982 RECOVER WASTE HEAT FROM EQUIPMENT $2,497 $700 Not Implemented
UD0022 # 03 Y:1982 03 1982 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS $39,185 $33,000 Implemented
UD0023 # 01 Y:1982 01 1982 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $7,104 $6,705 Implemented