IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

68,691

matching recommendations
Reset
ARC 2. ENERGY MANAGEMENT
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MO0029 # 06 Y:1991 06 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,224 $115 Implemented
MO0029 # 07 Y:1991 07 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $124 $175 Implemented
MO0029 # 08 Y:1991 08 1991 INSULATE BARE EQUIPMENT $879 $213 Implemented
MO0029 # 09 Y:1991 09 1991 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $96 $0 Implemented
OR0118 # 01 Y:1991 01 1991 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,432 $0 Implemented
OR0118 # 02 Y:1991 02 1991 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $2,838 $0 Implemented
OR0118 # 03 Y:1991 03 1991 INSULATE BARE EQUIPMENT $3,367 $3,124 Implemented
OR0118 # 04 Y:1991 04 1991 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $383 $919 Implemented
OR0118 # 05 Y:1991 05 1991 OPTIMIZE PLANT POWER FACTOR $2,040 $5,100 Implemented
OR0118 # 06 Y:1991 06 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $312 $1,177 Implemented
IA0001 # 01 Y:1991 01 1991 INSTALL TIMERS AND/OR THERMOSTATS $2,263 $900 Implemented
IA0001 # 02 Y:1991 02 1991 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $464 $448 Implemented
IA0001 # 03 Y:1991 03 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $248 $0 Implemented
IA0001 # 04 Y:1991 04 1991 REDUCE VENTILATION AIR $507 $700 Implemented
IA0001 # 05 Y:1991 05 1991 RECOVER WASTE HEAT FROM EQUIPMENT $382 $686 Implemented
IA0001 # 06 Y:1991 06 1991 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $182 $90 Implemented
IA0001 # 07 Y:1991 07 1991 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $95 $20 Implemented
IA0001 # 08 Y:1991 08 1991 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $112 $20 Implemented
IA0001 # 09 Y:1991 09 1991 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $192 $20 Implemented
IA0002 # 02 Y:1991 02 1991 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,080 $100 Implemented
IA0002 # 03 Y:1991 03 1991 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $545 $2,336 Implemented
IA0002 # 04 Y:1991 04 1991 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,727 $100 Implemented
IA0002 # 05 Y:1991 05 1991 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $527 $0 Implemented
IA0002 # 06 Y:1991 06 1991 INSTALL TIMERS AND/OR THERMOSTATS $446 $300 Implemented
IA0002 # 07 Y:1991 07 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $141 $261 Implemented