IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

68,649

matching recommendations
Reset
ARC 2. ENERGY MANAGEMENT
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AT0123 # 04 Y:1989 04 1989 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $392 $600 Implemented
AT0123 # 05 Y:1989 05 1989 RECOVER WASTE HEAT FROM EQUIPMENT $972 $600 Implemented
AT0123 # 07 Y:1989 07 1989 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $454 $257 Implemented
AT0123 # 08 Y:1989 08 1989 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,075 $0 Implemented
AT0124 # 02 Y:1989 02 1989 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $656 $500 Implemented
AT0124 # 03 Y:1989 03 1989 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $34,933 $2,700 Implemented
KU0273 # 01 Y:1989 01 1989 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $25,620 $38,400 Implemented
KU0273 # 02 Y:1989 02 1989 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $10,343 $1,400 Implemented
KU0273 # 03 Y:1989 03 1989 INSTALL TURBULATORS $5,599 $5,760 Implemented
KU0273 # 04 Y:1989 04 1989 KEEP BOILER TUBES CLEAN $3,005 $1,500 Implemented
KU0273 # 05 Y:1989 05 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,859 $2,558 Implemented
KU0274 # 01 Y:1989 01 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,538 $7,607 Implemented
KU0274 # 02 Y:1989 02 1989 INSTALL TIMERS AND/OR THERMOSTATS $3,173 $0 Implemented
KU0274 # 03 Y:1989 03 1989 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $362 $300 Implemented
KU0274 # 04 Y:1989 04 1989 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $162 $80 Implemented
KU0274 # 06 Y:1989 06 1989 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $251 $0 Implemented
LT0143 # 03 Y:1989 03 1989 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,098 $10,238 Implemented
LT0143 # 04 Y:1989 04 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,460 $417 Implemented
RU0047 # 01 Y:1989 01 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,402 $441 Implemented
RU0047 # 02 Y:1989 02 1989 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,029 $0 Implemented
RU0047 # 05 Y:1989 05 1989 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,670 $594 Implemented
RU0047 # 06 Y:1989 06 1989 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,506 $0 Implemented
RU0047 # 07 Y:1989 07 1989 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $1,869 $0 Implemented
RU0048 # 02 Y:1989 02 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,693 $17,613 Implemented
RU0048 # 03 Y:1989 03 1989 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,252 $0 Implemented