IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

147,988

matching recommendations
Reset
ARC 2. ENERGY MANAGEMENT
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0218 # 02 Y:1991 02 1991 USE DEMAND CONTROLLER OR LOAD SHEDDER $14,649 $15,470 Implemented
MA0218 # 03 Y:1991 03 1991 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $7,973 $724 Implemented
MA0218 # 04 Y:1991 04 1991 INSTALL / REPAIR INSULATION ON STEAM LINES $1,981 $726 Implemented
MA0218 # 05 Y:1991 05 1991 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $753 $0 Implemented
MA0218 # 06 Y:1991 06 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,262 $15,300 Implemented
MA0219 # 01 Y:1991 01 1991 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $36,849 $0 Implemented
MA0219 # 02 Y:1991 02 1991 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $30,005 $7,000 Implemented
MA0219 # 03 Y:1991 03 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,604 $446 Implemented
MA0219 # 04 Y:1991 04 1991 INSTALL TIMERS AND/OR THERMOSTATS $6,693 $100 Implemented
MA0219 # 05 Y:1991 05 1991 UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING $8,835 $3,850 Implemented
MA0219 # 06 Y:1991 06 1991 INSTALL SET-BACK TIMERS $629 $85 Implemented
CO0216 # 01 Y:1991 01 1991 REDUCE VENTILATION AIR $1,400 $500 Implemented
CO0216 # 02 Y:1991 02 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,084 $2,170 Implemented
CO0216 # 03 Y:1991 03 1991 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $1,100 $800 Implemented
CO0216 # 04 Y:1991 04 1991 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $303 $598 Implemented
CO0216 # 05 Y:1991 05 1991 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $280 $150 Implemented
CO0216 # 06 Y:1991 06 1991 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $240 $250 Implemented
CO0216 # 07 Y:1991 07 1991 DISCONNECT BALLASTS $440 $800 Implemented
CO0216 # 08 Y:1991 08 1991 INSTALL AUTOMATIC STACK DAMPER $440 $1,100 Implemented
CO0217 # 01 Y:1991 01 1991 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $9,147 $1,550 Implemented
CO0217 # 02 Y:1991 02 1991 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $1,560 $2,500 Implemented
CO0217 # 03 Y:1991 03 1991 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,180 $1,000 Implemented
CO0217 # 04 Y:1991 04 1991 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $1,160 $1,150 Implemented
CO0217 # 05 Y:1991 05 1991 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $218 $325 Implemented
CO0217 # 06 Y:1991 06 1991 INSTALL SET-BACK TIMERS $340 $1,040 Implemented