IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

143,570

matching recommendations
Reset
ARC 2. ENERGY MANAGEMENT
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0174 # 03 Y:1985 03 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $310 $358 Implemented
OK0174 # 04 Y:1985 04 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,578 $21,250 Implemented
OK0175 # 01 Y:1985 01 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $678 $1,252 Implemented
OK0175 # 02 Y:1985 02 1985 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $4,344 $3,461 Not Implemented
OK0175 # 03 Y:1985 03 1985 INSTALL TIMERS AND/OR THERMOSTATS $748 $400 Implemented
OK0175 # 04 Y:1985 04 1985 USE DEMAND CONTROLLER OR LOAD SHEDDER $1,056 $330 Not Implemented
OK0175 # 05 Y:1985 05 1985 REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF $1,954 $4,000 Implemented
OK0175 # 06 Y:1985 06 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,146 $35,020 Not Implemented
OK0176 # 01 Y:1985 01 1985 INSTALL TIMERS AND/OR THERMOSTATS $428 $650 Implemented
OK0176 # 02 Y:1985 02 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $45 $12 Implemented
OK0176 # 03 Y:1985 03 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $191 $240 Implemented
OK0176 # 04 Y:1985 04 1985 AIR CONDITION ONLY SPACE NECESSARY $71 $145 Implemented
OK0176 # 05 Y:1985 05 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $18 $60 Implemented
MA0028 # 01 Y:1985 01 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,972 $18,343 Not Implemented
MA0028 # 02 Y:1985 02 1985 RECOVER WASTE HEAT FROM EQUIPMENT $1,990 $3,525 Not Implemented
MA0028 # 03 Y:1985 03 1985 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $218 $262 Not Implemented
MA0028 # 04 Y:1985 04 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,497 $94 Implemented
MA0028 # 05 Y:1985 05 1985 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $606 $209 Not Implemented
MA0029 # 01 Y:1985 01 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $344 $94 Not Implemented
MA0029 # 02 Y:1985 02 1985 USE DIRECT AIR SUPPLY TO EXHAUST HOODS $17,454 $9,015 Not Implemented
MA0029 # 03 Y:1985 03 1985 RECOVER WASTE HEAT FROM EQUIPMENT $6,980 $268 Not Implemented
MA0029 # 04 Y:1985 04 1985 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $636 $763 Not Implemented
MA0029 # 05 Y:1985 05 1985 REDUCE FLUID FLOW RATES $2,655 $0 Not Implemented
MA0029 # 06 Y:1985 06 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,968 $2,000 Not Implemented
MA0030 # 01 Y:1985 01 1985 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,013 $1,515 Implemented