IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

143,515

matching recommendations
Reset
ARC 2. ENERGY MANAGEMENT
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0150 # 02 Y:1984 02 1984 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $140 $0 Implemented
OK0150 # 03 Y:1984 03 1984 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $45 $60 Implemented
OK0150 # 04 Y:1984 04 1984 REPAIR AND ELIMINATE STEAM LEAKS $1,250 $180 Implemented
OK0150 # 05 Y:1984 05 1984 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $745 $122 Not Implemented
OK0150 # 06 Y:1984 06 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,460 $1,350 Not Implemented
OK0150 # 07 Y:1984 07 1984 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $60 $50 Implemented
OK0150 # 08 Y:1984 08 1984 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $355 $80 Implemented
OK0150 # 09 Y:1984 09 1984 INSULATE BARE EQUIPMENT $103 $84 Implemented
OK0150 # 10 Y:1984 10 1984 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $563 $116 Not Implemented
OK0150 # 11 Y:1984 11 1984 INSULATE BARE EQUIPMENT $113 $310 Implemented
OK0150 # 12 Y:1984 12 1984 USE DEMAND CONTROLLER OR LOAD SHEDDER $105 $0 Not Implemented
OK0150 # 13 Y:1984 13 1984 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $42 $127 Implemented
KU0129 # 01 Y:1984 01 1984 IMPROVE LUBRICATION PRACTICES $15,682 $1,300 Not Implemented
KU0129 # 02 Y:1984 02 1984 RECOVER WASTE HEAT FROM EQUIPMENT $8,014 $6,400 Not Implemented
KU0129 # 03 Y:1984 03 1984 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $3,368 $3,000 Implemented
KU0129 # 04 Y:1984 04 1984 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $10,366 $0 Implemented
KU0129 # 05 Y:1984 05 1984 INSTALL TURBULATORS $7,337 $2,000 Implemented
KU0129 # 06 Y:1984 06 1984 MINIMIZE BOILER BLOWDOWN WITH BETTER FEEDWATER TREATMENT $4,922 $3,000 Implemented
KU0129 # 07 Y:1984 07 1984 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,524 $8,000 Not Implemented
KU0129 # 08 Y:1984 08 1984 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $1,411 $1,330 Not Implemented
KU0129 # 09 Y:1984 09 1984 INCREASE AMOUNT OF CONDENSATE RETURNED $2,264 $2,500 Implemented
KU0129 # 10 Y:1984 10 1984 SHUT OFF STEAM TRAPS ON SUPER HEATED STEAM LINES WHEN NOT IN USE $5,557 $300 Implemented
KU0129 # 12 Y:1984 12 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,428 $3,565 Implemented
KU0129 # 13 Y:1984 13 1984 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,710 $960 Implemented
KU0129 # 14 Y:1984 14 1984 RECOVER WASTE HEAT FROM EQUIPMENT $2,390 $4,520 Not Implemented