IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

183

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LM0085 # 10 Y:2004 10 2004 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $54,080 $3,320 Implemented
LM0085 # 09 Y:2004 09 2004 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $3,360 $1,850 Implemented
LM0085 # 08 Y:2004 08 2004 DEVELOP STANDARD OPERATING PROCEDURES $18,000 $2,450 Implemented
LM0085 # 07 Y:2004 07 2004 $9,060 $1,500 Implemented
LM0085 # 06 Y:2004 06 2004 PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST $26,300 $4,450 Implemented
LM0085 # 05 Y:2004 05 2004 ADJUST BURNERS FOR EFFICIENT OPERATION $5,902 $600 Implemented
LM0085 # 04 Y:2004 04 2004 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $1,335 $741 Not Implemented
LM0085 # 03 Y:2004 03 2004 CLEAN FOULING FROM WATER LINES REGULARLY $2,852 $180 Implemented
LM0085 # 02 Y:2004 02 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $167 $0 Implemented
LM0085 # 01 Y:2004 01 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,324 $205 Implemented
LM0084 # 02 Y:2004 02 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,307 $100 Implemented
LM0084 # 01 Y:2004 01 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,653 $0 Not Implemented
LM0084 # 03 Y:2004 03 2004 REPAIR AND ELIMINATE STEAM LEAKS $3,173 $396 Implemented
LM0084 # 04 Y:2004 04 2004 REUSE / RECYCLE/ SELL PAPER PRODUCTS $438 $0 Not Implemented
LM0084 # 05 Y:2004 05 2004 INCREASE AMOUNT OF CONDENSATE RETURNED $620 $800 Not Implemented
LM0084 # 06 Y:2004 06 2004 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,058 $1,800 Not Implemented
LM0084 # 07 Y:2004 07 2004 INSULATE FEEDWATER TANK $329 $507 Not Implemented
LM0084 # 09 Y:2004 09 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,089 $983 Not Implemented
LM0084 # 08 Y:2004 08 2004 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,604 $250 Implemented
LM0084 # 13 Y:2004 13 2004 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $1,952 $450 Not Implemented
LM0084 # 12 Y:2004 12 2004 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $614 $0 Implemented
LM0084 # 11 Y:2004 11 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,231 $20,284 Not Implemented
LM0084 # 10 Y:2004 10 2004 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $121,324 $125,104 Not Implemented
LM0083 # 01 Y:2004 01 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $28,411 $5,040 Not Implemented
LM0083 # 02 Y:2004 02 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $836 $0 Implemented