IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

305

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0302 # 01 Y:1994 01 1994 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $19,139 $8,246 Not Implemented
MA0302 # 02 Y:1994 02 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,102 $180 Implemented
MA0302 # 03 Y:1994 03 1994 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $8,142 $25,365 Not Implemented
MA0302 # 04 Y:1994 04 1994 BURN A LESS EXPENSIVE GRADE OF FUEL $9,629 $17,304 Implemented
MA0302 # 05 Y:1994 05 1994 INSTALL SET-BACK TIMERS $3,309 $254 Implemented
MA0302 # 06 Y:1994 06 1994 INSTALL OCCUPANCY SENSORS $1,995 $1,466 Implemented
MA0302 # 07 Y:1994 07 1994 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $5,628 $6,425 Implemented
MA0258 # 01 Y:1992 01 1992 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,096 $0 Not Implemented
MA0258 # 02 Y:1992 02 1992 INSULATE BARE EQUIPMENT $954 $314 Not Implemented
MA0258 # 03 Y:1992 03 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $590 $1 Implemented
MA0258 # 04 Y:1992 04 1992 INSTALL SET-BACK TIMERS $813 $592 Not Implemented
MA0258 # 05 Y:1992 05 1992 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $177 $145 Implemented
MA0258 # 06 Y:1992 06 1992 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,629 $0 Not Implemented
MA0233 # 01 Y:1992 01 1992 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $28,770 $2,000 Implemented
MA0233 # 02 Y:1992 02 1992 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $4,263 $0 Not Implemented
MA0233 # 03 Y:1992 03 1992 INSULATE BARE EQUIPMENT $10,672 $12,412 Implemented
MA0233 # 04 Y:1992 04 1992 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $7,341 $14,210 Implemented
MA0233 # 05 Y:1992 05 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,334 $8,000 Implemented
MA0233 # 06 Y:1992 06 1992 SUBSTITUTE HOT PROCESS FLUIDS FOR STEAM $2,393 $10,000 Not Implemented
MA0233 # 07 Y:1992 07 1992 IMPROVE LUBRICATION PRACTICES $1,170 $0 Implemented
MA0227 # 01 Y:1991 01 1991 OPTIMIZE PLANT POWER FACTOR $4,097 $12,000 Not Implemented
MA0227 # 02 Y:1991 02 1991 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,375 $1,566 Not Implemented
MA0227 # 03 Y:1991 03 1991 INSULATE BARE EQUIPMENT $974 $1,350 Not Implemented
MA0218 # 01 Y:1991 01 1991 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $30,047 $51,400 Implemented
MA0218 # 02 Y:1991 02 1991 USE DEMAND CONTROLLER OR LOAD SHEDDER $14,649 $15,470 Implemented