Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
158
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0023 # 04 Y:2001 | 04 | 2001 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $11,384 | $143 | Not Implemented |
MI0023 # 03 Y:2001 | 03 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,387 | $3 | Not Implemented |
MI0023 # 02 Y:2001 | 02 | 2001 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $69,120 | $150,000 | Not Implemented |
MI0023 # 06 Y:2001 | 06 | 2001 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,432 | $6 | Not Implemented |
MI0023 # 01 Y:2001 | 01 | 2001 | METER WASTE WATER | $2,223 | $3,650 | Not Implemented |
MI0023 # 07 Y:2001 | 07 | 2001 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $2,831 | $1,879 | Not Implemented |
MI0023 # 05 Y:2001 | 05 | 2001 | TURN OFF EQUIPMENT WHEN NOT IN USE | $22,932 | $2 | Not Implemented |
MI0022 # 01 Y:2001 | 01 | 2001 | METER WASTE WATER | $2,560 | $3,650 | Not Implemented |
MI0022 # 02 Y:2001 | 02 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,195 | $331 | Not Implemented |
MI0022 # 04 Y:2001 | 04 | 2001 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $1,817 | $56 | Not Implemented |
MI0022 # 03 Y:2001 | 03 | 2001 | INSTALL SHELVES / RACKS TO UTILIZE UNUSED SPACE | $4,177 | $3,116 | Not Implemented |
MI0022 # 05 Y:2001 | 05 | 2001 | IMPROVE SPACE COMFORT CONDITIONING | $6,250 | $3,000 | Not Implemented |
MI0021 # 04 Y:2001 | 04 | 2001 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $2,275 | $7 | Not Implemented |
MI0021 # 05 Y:2001 | 05 | 2001 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $3,250 | $4,200 | Implemented |
MI0021 # 01 Y:2001 | 01 | 2001 | METER WASTE WATER | $13,904 | $3,650 | Not Implemented |
MI0021 # 03 Y:2001 | 03 | 2001 | MODIFY STARTUP/SHUTDOWN TIMES | $3,634 | $113 | Not Implemented |
MI0021 # 02 Y:2001 | 02 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,770 | $312 | Implemented |
MI0025 # 03 Y:2001 | 03 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $492 | $2 | Not Implemented |
MI0025 # 05 Y:2001 | 05 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $694 | $1,778 | Implemented |
MI0025 # 01 Y:2001 | 01 | 2001 | RECOVER MECHANICAL ENERGY | $165,750 | $15,000 | Not Implemented |
MI0025 # 04 Y:2001 | 04 | 2001 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $1,050 | $100 | Implemented |
MI0025 # 02 Y:2001 | 02 | 2001 | ELIMINATE A BY-PRODUCT | $35,000 | $100 | Not Implemented |
MI0024 # 02 Y:2001 | 02 | 2001 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $11,590 | $7 | n/a |
MI0024 # 03 Y:2001 | 03 | 2001 | ADD AREA LIGHTING SWITCHES | $2,108 | $1,000 | n/a |
MI0024 # 04 Y:2001 | 04 | 2001 | ADD AREA LIGHTING SWITCHES | $1,333 | $700 | n/a |