Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,176
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NC0049 # 03 Y:1995 | 03 | 1995 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,443 | $8,000 | Not Implemented |
NC0049 # 04 Y:1995 | 04 | 1995 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,293 | $432 | Not Implemented |
NC0049 # 05 Y:1995 | 05 | 1995 | INSTALL OCCUPANCY SENSORS | $1,245 | $3,600 | Not Implemented |
NC0049 # 06 Y:1995 | 06 | 1995 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $4,915 | $2,000 | Implemented |
NC0049 # 07 Y:1995 | 07 | 1995 | ADD AREA LIGHTING SWITCHES | $478 | $1,200 | Not Implemented |
NC0049 # 08 Y:1995 | 08 | 1995 | REDUCE GLAZED AREAS IN BUILDINGS | $5,285 | $1,400 | Implemented |
NC0049 # 09 Y:1995 | 09 | 1995 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,233 | $4,000 | Not Implemented |
NC0049 # 10 Y:1995 | 10 | 1995 | INSTALL FOSSIL FUEL MAKE-UP AIR UNIT | $10,722 | $2,115 | Not Implemented |
NC0048 # 03 Y:1995 | 03 | 1995 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $195 | $38 | Not Implemented |
NC0048 # 04 Y:1995 | 04 | 1995 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $589 | $180 | Not Implemented |
NC0048 # 05 Y:1995 | 05 | 1995 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $3,762 | $1,000 | Not Implemented |
NC0048 # 06 Y:1995 | 06 | 1995 | INSULATE BARE EQUIPMENT | $2,212 | $6,061 | Not Implemented |
NC0048 # 01 Y:1995 | 01 | 1995 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $1,504 | $0 | Not Implemented |
NC0048 # 02 Y:1995 | 02 | 1995 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $112 | $100 | Not Implemented |
NC0047 # 01 Y:1995 | 01 | 1995 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,390 | $60 | Implemented |
NC0047 # 02 Y:1995 | 02 | 1995 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,105 | $320 | Not Implemented |
NC0047 # 03 Y:1995 | 03 | 1995 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,787 | $3,000 | Implemented |
NC0047 # 04 Y:1995 | 04 | 1995 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $3,881 | $1,500 | Not Implemented |
NC0047 # 05 Y:1995 | 05 | 1995 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $4,139 | $3,000 | Not Implemented |
NC0047 # 06 Y:1995 | 06 | 1995 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $3,550 | $4,020 | Implemented |
NC0047 # 07 Y:1995 | 07 | 1995 | INSULATE BARE EQUIPMENT | $5,148 | $906 | Not Implemented |
NC0046 # 01 Y:1995 | 01 | 1995 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $251 | $330 | Implemented |
NC0046 # 02 Y:1995 | 02 | 1995 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $3,179 | $6,550 | Implemented |
NC0046 # 03 Y:1995 | 03 | 1995 | USE COOLING TOWER WATER INSTEAD OF REFRIGERATION | $13,396 | $12,000 | Not Implemented |
NC0046 # 04 Y:1995 | 04 | 1995 | MAKE ICE DURING OFF PEAK HOURS FOR COOLING | $18,043 | $36,000 | Not Implemented |