IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,176

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0006 # 07 Y:1993 07 1993 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,538 $6,000 Not Implemented
NC0002 # 01 Y:1993 01 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $566 $522 Implemented
NC0002 # 02 Y:1993 02 1993 INSTALL SPECTRAL REFLECTORS / DELAMP $3,351 $120 Not Implemented
NC0002 # 03 Y:1993 03 1993 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $1,991 $1,209 Implemented
NC0002 # 04 Y:1993 04 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,206 $100 Implemented
NC0002 # 05 Y:1993 05 1993 INSTALL SKYLIGHTS $5,957 $9,715 Not Implemented
NC0002 # 06 Y:1993 06 1993 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $17,784 $39,880 Not Implemented
NC0003 # 01 Y:1993 01 1993 USE PHOTOCELL CONTROLS $381 $159 Implemented
NC0003 # 02 Y:1993 02 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $648 $360 Implemented
NC0003 # 03 Y:1993 03 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,625 $300 Implemented
NC0003 # 04 Y:1993 04 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,844 $1,000 Implemented
NC0003 # 05 Y:1993 05 1993 RECOVER WASTE HEAT FROM EQUIPMENT $6,594 $6,000 Implemented
NC0003 # 06 Y:1993 06 1993 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $13,205 $31,000 Not Implemented
NC0003 # 07 Y:1993 07 1993 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $307 $650 Implemented
NC0004 # 01 Y:1993 01 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,514 $1,222 Implemented
NC0004 # 02 Y:1993 02 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,054 $690 Implemented
NC0004 # 03 Y:1993 03 1993 RECOVER AND REUSE COOLING WATER $834 $500 Not Implemented
NC0004 # 04 Y:1993 04 1993 RECOVER WASTE HEAT FROM EQUIPMENT $26,384 $1,500 Not Implemented
NC0004 # 05 Y:1993 05 1993 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $1,143 $1,100 Not Implemented
NC0004 # 06 Y:1993 06 1993 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $1,494 $4,500 Not Implemented
NC0001 # 01 Y:1993 01 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,139 $1,577 Not Implemented
NC0001 # 02 Y:1993 02 1993 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,100 $500 Implemented
NC0001 # 03 Y:1993 03 1993 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $745 $300 Implemented
NC0001 # 04 Y:1993 04 1993 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $588 $10 Implemented
NC0001 # 05 Y:1993 05 1993 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $162 $100 Implemented