IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

228

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0075 # 02 Y:1995 02 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,267 $1,710 Implemented
NC0075 # 03 Y:1995 03 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $482 $1,680 Not Implemented
NC0075 # 06 Y:1995 06 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $720 $200 Implemented
NC0075 # 01 Y:1995 01 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,682 $546 Implemented
NC0075 # 04 Y:1995 04 1995 USE COLD WASTE WATER TO COOL CHILLER FEED WATER $5,067 $8,000 Implemented
NC0075 # 05 Y:1995 05 1995 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $72,500 $170,000 Implemented
NC0073 # 02 Y:1995 02 1995 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $16,833 $84,000 Not Implemented
NC0073 # 03 Y:1995 03 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $416 $120 Implemented
NC0073 # 04 Y:1995 04 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,535 $1,320 Not Implemented
NC0073 # 05 Y:1995 05 1995 USE POWER DURING OFF-PEAK PERIODS $4,284 $0 Implemented
NC0073 # 01 Y:1995 01 1995 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $87,425 $160,000 Not Implemented
NC0072 # 08 Y:1995 08 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $851 $434 n/a
NC0072 # 04 Y:1995 04 1995 INSULATE BARE EQUIPMENT $343 $270 n/a
NC0072 # 10 Y:1995 10 1995 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $4,784 $0 n/a
NC0072 # 05 Y:1995 05 1995 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,426 $600 n/a
NC0072 # 06 Y:1995 06 1995 REDUCE VENTILATION AIR $2,692 $2,700 n/a
NC0072 # 02 Y:1995 02 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,164 $96 n/a
NC0072 # 03 Y:1995 03 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,034 $1,678 n/a
NC0072 # 01 Y:1995 01 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $702 $780 n/a
NC0072 # 07 Y:1995 07 1995 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $93,047 $400,000 n/a
NC0072 # 09 Y:1995 09 1995 RETURN SPENT SOLUTIONS TO THE MANUFACTURER $45,541 $10,000 n/a
NC0071 # 06 Y:1995 06 1995 INSULATE BARE EQUIPMENT $842 $268 Not Implemented
NC0071 # 07 Y:1995 07 1995 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,848 $600 Not Implemented
NC0071 # 05 Y:1995 05 1995 INSULATE BARE EQUIPMENT $848 $299 Implemented
NC0071 # 01 Y:1995 01 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,303 $450 Implemented