IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

27

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OD0045 # 06 Y:1995 06 1995 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $2,641 $0 Not Implemented
OD0045 # 05 Y:1995 05 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $96 $57 Implemented
OD0045 # 04 Y:1995 04 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,130 $13,131 Implemented
OD0045 # 03 Y:1995 03 1995 INSTALL TIMERS AND/OR THERMOSTATS $4,702 $0 Implemented
OD0045 # 02 Y:1995 02 1995 INSTALL OCCUPANCY SENSORS $1,115 $394 Implemented
OD0045 # 07 Y:1995 07 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $480 $160 Implemented
OD0045 # 01 Y:1995 01 1995 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $2,747 $704 Not Implemented
OD0042 # 07 Y:1995 07 1995 DO NOT USE COMPRESSED AIR FOR PERSONAL COOLING $462 $20 Not Implemented
OD0042 # 06 Y:1995 06 1995 INSTALL TIMERS AND/OR THERMOSTATS $2,074 $1,170 Not Implemented
OD0042 # 05 Y:1995 05 1995 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $7,916 $2,449 Not Implemented
OD0042 # 04 Y:1995 04 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,061 $3,657 Implemented
OD0042 # 03 Y:1995 03 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $37,136 $66,487 Implemented
OD0042 # 02 Y:1995 02 1995 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $29,544 $5,168 Implemented
OD0042 # 01 Y:1995 01 1995 METER WASTE WATER $32,200 $717 Implemented
OD0043 # 01 Y:1995 01 1995 INSTALL TIMERS AND/OR THERMOSTATS $4,482 $1,755 Not Implemented
OD0043 # 02 Y:1995 02 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,495 $1,756 Not Implemented
OD0043 # 03 Y:1995 03 1995 USE PHOTOCELL CONTROLS $2,498 $340 Not Implemented
OD0043 # 04 Y:1995 04 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $617 $1,000 Not Implemented
OD0043 # 05 Y:1995 05 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $296 $153 Not Implemented
OD0043 # 06 Y:1995 06 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $575 $302 Not Implemented
OD0039 # 01 Y:1995 01 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,668 $13,845 Implemented
OD0039 # 06 Y:1995 06 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $211 $320 Implemented
OD0039 # 05 Y:1995 05 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $236 $1,787 Not Implemented
OD0039 # 04 Y:1995 04 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $305 $225 Implemented
OD0039 # 03 Y:1995 03 1995 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $2,565 $5,000 Not Implemented