IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

432

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
ST0005 # 05 Y:1984 05 1984 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $4,348 $0 Implemented
ST0005 # 06 Y:1984 06 1984 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,698 $269 Implemented
ST0005 # 07 Y:1984 07 1984 RECOVER WASTE HEAT FROM EQUIPMENT $4,579 $268 Implemented
ST0005 # 08 Y:1984 08 1984 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $926 $269 Implemented
ST0005 # 09 Y:1984 09 1984 UTILIZE SENSORS CONTROLLING ROOF AND WALL OPENINGS $866 $846 Implemented
ST0006 # 01 Y:1984 01 1984 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,274 $537 Implemented
ST0006 # 02 Y:1984 02 1984 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $64 $0 Implemented
ST0006 # 03 Y:1984 03 1984 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,291 $48 Implemented
ST0006 # 07 Y:1984 07 1984 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $8,044 $0 Implemented
ST0001 # 01 Y:1984 01 1984 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $31 $0 Implemented
ST0001 # 02 Y:1984 02 1984 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $692 $537 Implemented
ST0001 # 03 Y:1984 03 1984 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,350 $88 Implemented
ST0001 # 05 Y:1984 05 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,130 $3,299 Implemented
ST0001 # 07 Y:1984 07 1984 AIR CONDITION ONLY SPACE NECESSARY $846 $675 Implemented
ST0001 # 09 Y:1984 09 1984 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $2,902 $0 Implemented
ST0002 # 01 Y:1984 01 1984 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $306 $0 Implemented
ST0002 # 02 Y:1984 02 1984 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,941 $40 Implemented
ST0002 # 03 Y:1984 03 1984 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $845 $80 Implemented
ST0002 # 04 Y:1984 04 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,150 $310 Implemented
ST0002 # 06 Y:1984 06 1984 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $450 $537 Implemented
ST0002 # 07 Y:1984 07 1984 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $584 $420 Implemented
ST0002 # 08 Y:1984 08 1984 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $3,455 $1,800 Implemented
ST0002 # 10 Y:1984 10 1984 SHUT OFF PILOTS IN STANDBY EQUIPMENT $296 $0 Implemented
ST0002 # 11 Y:1984 11 1984 RECOVER WASTE HEAT FROM EQUIPMENT $147 $370 Implemented
ST0002 # 12 Y:1984 12 1984 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,070 $0 Implemented