IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

109

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
ST0062 # 02 Y:1986 02 1986 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,642 $0 Implemented
ST0062 # 03 Y:1986 03 1986 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,555 $0 Not Implemented
ST0062 # 04 Y:1986 04 1986 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $716 $0 Not Implemented
ST0062 # 05 Y:1986 05 1986 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $559 $50 Not Implemented
ST0062 # 06 Y:1986 06 1986 INSTALL TIMERS AND/OR THERMOSTATS $2,605 $1,500 Implemented
ST0062 # 07 Y:1986 07 1986 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,765 $651 Implemented
ST0063 # 01 Y:1986 01 1986 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $347 $102 Implemented
ST0063 # 02 Y:1986 02 1986 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $518 $0 Implemented
ST0063 # 03 Y:1986 03 1986 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,096 $537 Implemented
ST0063 # 04 Y:1986 04 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,600 $783 Not Implemented
ST0063 # 05 Y:1986 05 1986 CHANGE ZONE REHEAT COILS TO VARIABLE AIR VOLUME BOXES $11,118 $20,000 Not Implemented
ST0063 # 06 Y:1986 06 1986 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $289 $0 Implemented
ST0063 # 07 Y:1986 07 1986 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,593 $8,000 Not Implemented
ST0063 # 08 Y:1986 08 1986 RECOVER WASTE HEAT FROM EQUIPMENT $2,371 $4,000 Not Implemented
ST0024 # 01 Y:1985 01 1985 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $196 $0 Implemented
ST0024 # 02 Y:1985 02 1985 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $65 $95 Not Implemented
ST0024 # 03 Y:1985 03 1985 RECOVER WASTE HEAT FROM EQUIPMENT $1,844 $1,600 Not Implemented
ST0024 # 04 Y:1985 04 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $893 $112 Implemented
ST0024 # 05 Y:1985 05 1985 CHANGE ZONE REHEAT COILS TO VARIABLE AIR VOLUME BOXES $2,549 $3,000 Not Implemented
ST0024 # 06 Y:1985 06 1985 INSTALL AUTOMATIC STACK DAMPER $200 $2,550 Not Implemented
ST0024 # 07 Y:1985 07 1985 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $1,678 $0 Implemented
ST0024 # 08 Y:1985 08 1985 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,190 $1,428 Not Implemented
ST0024 # 09 Y:1985 09 1985 INSULATE BARE EQUIPMENT $44 $26 Implemented
ST0024 # 10 Y:1985 10 1985 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $7,186 $1,900 Implemented
ST0024 # 11 Y:1985 11 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,038 $2,186 Implemented