Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
260
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UC2401 # 03 Y:2024 | 03 | 2024 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $8,586 | $48,007 | n/a |
UC2401 # 02 Y:2024 | 02 | 2024 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $8,715 | $0 | n/a |
UC2317 # 07 Y:2023 | 07 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,763 | $17,190 | n/a |
UC2317 # 09 Y:2023 | 09 | 2023 | ADOPT IN-HOUSE MATERIAL GENERATION | $30,659 | $188,853 | n/a |
UC2317 # 05 Y:2023 | 05 | 2023 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $5,240 | $50 | n/a |
UC2317 # 02 Y:2023 | 02 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $392 | $75 | n/a |
UC2317 # 06 Y:2023 | 06 | 2023 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $714 | $540 | n/a |
UC2317 # 01 Y:2023 | 01 | 2023 | OPTIMIZE PLANT POWER FACTOR | $90,350 | $29,189 | n/a |
UC2317 # 12 Y:2023 | 12 | 2023 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $5,411 | $0 | n/a |
UC2317 # 03 Y:2023 | 03 | 2023 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,123 | $428 | n/a |
UC2317 # 08 Y:2023 | 08 | 2023 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,409 | $34,609 | n/a |
UC2317 # 10 Y:2023 | 10 | 2023 | INSTALL TIMERS AND/OR THERMOSTATS | $6,903 | $1,468 | n/a |
UC2317 # 11 Y:2023 | 11 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $321,413 | $2,701,940 | n/a |
UC2317 # 04 Y:2023 | 04 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,584 | $1,300 | n/a |
UC2316 # 05 Y:2023 | 05 | 2023 | REDUCE EXCESSIVE BOILER BLOWDOWN | $2,801 | $12,000 | n/a |
UC2316 # 02 Y:2023 | 02 | 2023 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $7,167 | $5,801 | n/a |
UC2316 # 07 Y:2023 | 07 | 2023 | REPLACE BOILER | $177,614 | $423,535 | n/a |
UC2316 # 08 Y:2023 | 08 | 2023 | BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT | $22,194 | $134,412 | n/a |
UC2316 # 09 Y:2023 | 09 | 2023 | INSTALL WIND POWERED ELECTRIC GENERATOR | $1,380,736 | $10,992,131 | n/a |
UC2316 # 04 Y:2023 | 04 | 2023 | INSTALL TURBULATORS | $13,337 | $10,920 | n/a |
UC2316 # 06 Y:2023 | 06 | 2023 | BURN A LESS EXPENSIVE GRADE OF FUEL | $153,910 | $207,578 | n/a |
UC2316 # 01 Y:2023 | 01 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $26,355 | $75 | n/a |
UC2316 # 03 Y:2023 | 03 | 2023 | RECOVER AND REUSE WASTE MATERIAL | $76,811 | $332,613 | n/a |
UC2316 # 10 Y:2023 | 10 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $20,195 | $268,543 | n/a |
UC2315 # 10 Y:2023 | 10 | 2023 | USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS | $3,746 | $34,025 | n/a |