Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
142
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0269 # 03 Y:1988 | 03 | 1988 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $242 | $500 | Implemented |
UD0268 # 02 Y:1988 | 02 | 1988 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $3,128 | $3,448 | Implemented |
UD0270 # 02 Y:1988 | 02 | 1988 | USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS | $1,575 | $1,000 | Implemented |
UD0268 # 01 Y:1988 | 01 | 1988 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,113 | $0 | Implemented |
UD0269 # 01 Y:1988 | 01 | 1988 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $227 | $0 | Implemented |
UD0268 # 04 Y:1988 | 04 | 1988 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $281 | $0 | Implemented |
UD0269 # 04 Y:1988 | 04 | 1988 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $1,782 | $5,000 | Implemented |
UD0270 # 01 Y:1988 | 01 | 1988 | REDESIGN PROCESS | $3,796 | $1,000 | Implemented |
UD0269 # 02 Y:1988 | 02 | 1988 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $830 | $633 | Implemented |
UD0268 # 03 Y:1988 | 03 | 1988 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $6,096 | $3,000 | Implemented |
UD0266 # 04 Y:1988 | 04 | 1988 | REPAIR AND ELIMINATE STEAM LEAKS | $21,603 | $5,000 | Implemented |
UD0267 # 04 Y:1988 | 04 | 1988 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $1,285 | $552 | Implemented |
UD0266 # 02 Y:1988 | 02 | 1988 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $462 | $0 | Implemented |
UD0266 # 08 Y:1988 | 08 | 1988 | BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT | $155,320 | $875,000 | Not Implemented |
UD0267 # 03 Y:1988 | 03 | 1988 | CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS | $10,439 | $4,448 | Implemented |
UD0266 # 01 Y:1988 | 01 | 1988 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $7,611 | $600 | Implemented |
UD0267 # 02 Y:1988 | 02 | 1988 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $5,250 | $0 | Not Implemented |
UD0266 # 07 Y:1988 | 07 | 1988 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $9,266 | $30,000 | Implemented |
UD0266 # 06 Y:1988 | 06 | 1988 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,639 | $11,475 | Implemented |
UD0266 # 05 Y:1988 | 05 | 1988 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $23,169 | $20,000 | Implemented |
UD0267 # 01 Y:1988 | 01 | 1988 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $2,625 | $0 | Implemented |
UD0266 # 03 Y:1988 | 03 | 1988 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $10,213 | $7,000 | Not Implemented |
UD0264 # 01 Y:1988 | 01 | 1988 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $677 | $0 | Implemented |
UD0264 # 03 Y:1988 | 03 | 1988 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,732 | $3,790 | Implemented |
UD0264 # 02 Y:1988 | 02 | 1988 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $880 | $1,200 | Not Implemented |