IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,265

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0418 # 06 Y:2002 06 2002 REPLACE HIGH RESISTANCE DUCTS, PIPES, AND FITTINGS $1,650 $1,080 Implemented
AM0418 # 08 Y:2002 08 2002 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,400 $140 Implemented
AM0418 # 10 Y:2002 10 2002 PAY UTILITY BILLS ON TIME $1,008 $0 Implemented
AM0418 # 01 Y:2002 01 2002 REPAIR OR REPLACE STEAM TRAPS $33,700 $4,735 Implemented
AM0418 # 02 Y:2002 02 2002 INSTALL EQUIPMENT TO MOVE PRODUCT $20,000 $6,000 Implemented
AM0417 # 01 Y:2002 01 2002 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $120,900 $8,000 Implemented
AM0417 # 02 Y:2002 02 2002 OPTIMIZE PLANT POWER FACTOR $32,450 $24,980 Implemented
AM0417 # 03 Y:2002 03 2002 REPAIR AND ELIMINATE STEAM LEAKS $32,210 $4,900 Implemented
AM0417 # 04 Y:2002 04 2002 INSULATE BARE EQUIPMENT $7,230 $1,330 Implemented
AM0417 # 05 Y:2002 05 2002 REPAIR OR REPLACE STEAM TRAPS $3,480 $450 Implemented
AM0417 # 06 Y:2002 06 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,670 $880 Implemented
AM0417 # 07 Y:2002 07 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,100 $780 Implemented
AM0417 # 08 Y:2002 08 2002 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $440 $0 Implemented
AM0416 # 01 Y:2002 01 2002 USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS $64,320 $61,000 Implemented
AM0416 # 02 Y:2002 02 2002 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $2,340 $0 Implemented
AM0416 # 03 Y:2002 03 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,960 $400 Implemented
AM0416 # 04 Y:2002 04 2002 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,810 $210 Implemented
AM0416 # 05 Y:2002 05 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,550 $1,000 Implemented
AM0416 # 06 Y:2002 06 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $860 $410 Implemented
AM0416 # 07 Y:2002 07 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $565 $250 Implemented
AM0416 # 08 Y:2002 08 2002 PAY BILLS ON TIME TO AVOID LATE FEES $310 $0 Implemented
TA0027 # 02 Y:2002 02 2002 REUSE / RECYCLE/ SELL PAPER PRODUCTS $39,800 $7,500 Implemented
TA0027 # 04 Y:2002 04 2002 USE SYNTHETIC LUBRICANT $4,783 $0 Implemented
TA0027 # 05 Y:2002 05 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,550 $45 Implemented
TA0027 # 06 Y:2002 06 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $925 $615 Implemented