IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

75,235

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MO0094 # 06 Y:1993 06 1993 USE OPTIMUM TEMPERATURE $528 $200 Implemented
ND0161 # 01 Y:1993 01 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,842 $840 Implemented
ND0161 # 05 Y:1993 05 1993 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $527 $80 Implemented
UF0070 # 02 Y:1993 02 1993 INSULATE BARE EQUIPMENT $4,866 $2,520 Implemented
UF0070 # 03 Y:1993 03 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $7,941 $8,198 Implemented
UF0070 # 05 Y:1993 05 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,113 $2,339 Implemented
UF0070 # 12 Y:1993 12 1993 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,248 $0 Implemented
UD0408 # 01 Y:1993 01 1993 INCREASE ELECTRICAL CONDUCTOR SIZE TO REDUCE DISTRIBUTION LOSSES $2,008 $1,500 Implemented
UD0408 # 02 Y:1993 02 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,052 $21,676 Implemented
UD0408 # 03 Y:1993 03 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,726 $0 Implemented
UD0408 # 04 Y:1993 04 1993 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $13,391 $10,000 Implemented
UD0408 # 05 Y:1993 05 1993 INSTALL TIMERS AND/OR THERMOSTATS $6,067 $3,000 Implemented
AR0005 # 01 Y:1993 01 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,808 $7,910 Implemented
AR0005 # 02 Y:1993 02 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,193 $527 Implemented
AR0005 # 03 Y:1993 03 1993 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $5,869 $2,810 Implemented
AR0005 # 04 Y:1993 04 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,569 $120 Implemented
AR0005 # 05 Y:1993 05 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $455 $120 Implemented
SD0062 # 01 Y:1993 01 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,044 $950 Implemented
SD0062 # 02 Y:1993 02 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,350 $0 Implemented
SD0062 # 03 Y:1993 03 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $127 $80 Implemented
SD0062 # 06 Y:1993 06 1993 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $370 $47 Implemented
TN0501 # 01 Y:1993 01 1993 INSTALL TIMERS AND/OR THERMOSTATS $15,769 $6,930 Implemented
TN0501 # 02 Y:1993 02 1993 INSTALL SPECTRAL REFLECTORS / DELAMP $17,524 $43,092 Implemented
TN0501 # 03 Y:1993 03 1993 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $1,522 $580 Implemented
TN0501 # 04 Y:1993 04 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,822 $2,457 Implemented