IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

73,780

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LT0061 # 01 Y:1986 01 1986 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,073 $1,100 Implemented
LT0061 # 02 Y:1986 02 1986 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $406 $27 Implemented
LT0061 # 03 Y:1986 03 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,701 $491 Implemented
LT0062 # 01 Y:1986 01 1986 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $60,455 $5,000 Implemented
LT0062 # 02 Y:1986 02 1986 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $7,530 $500 Implemented
LT0062 # 03 Y:1986 03 1986 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,521 $0 Implemented
LT0064 # 01 Y:1986 01 1986 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $395 $85 Implemented
LT0064 # 02 Y:1986 02 1986 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $1,256 $0 Implemented
LT0064 # 03 Y:1986 03 1986 INSULATE BARE EQUIPMENT $1,575 $500 Implemented
LT0064 # 04 Y:1986 04 1986 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $437 $800 Implemented
LT0068 # 03 Y:1986 03 1986 OPTIMIZE PLANT POWER FACTOR $4,264 $8,000 Implemented
UD0202 # 01 Y:1986 01 1986 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,318 $0 Implemented
UD0202 # 03 Y:1986 03 1986 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $3,955 $0 Implemented
UD0202 # 04 Y:1986 04 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,636 $791 Implemented
UD0202 # 05 Y:1986 05 1986 INSTALL TIMERS AND/OR THERMOSTATS $1,504 $80 Implemented
UD0203 # 01 Y:1986 01 1986 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $4,191 $15,000 Implemented
UD0203 # 03 Y:1986 03 1986 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,499 $4,200 Implemented
UD0203 # 04 Y:1986 04 1986 RECOVER WASTE HEAT FROM EQUIPMENT $1,021 $100 Implemented
UD0204 # 02 Y:1986 02 1986 HEAT WATER WITH EXHAUST HEAT $12,542 $23,373 Implemented
UD0204 # 04 Y:1986 04 1986 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $11,866 $31,210 Implemented
UD0204 # 05 Y:1986 05 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $451 $331 Implemented
UD0204 # 07 Y:1986 07 1986 RECOVER WASTE HEAT FROM EQUIPMENT $668 $2,000 Implemented
UD0205 # 01 Y:1986 01 1986 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $15,692 $708 Implemented
UD0205 # 02 Y:1986 02 1986 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,886 $5,000 Implemented
UD0205 # 03 Y:1986 03 1986 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $13,480 $52,200 Implemented